To accept or not to accept: Are current criteria for lung donation still optimal or should they be revised?

被引:0
|
作者
Nicke, Marion [1 ]
Simon, Andre [2 ]
Fuehauf, Nils [1 ]
机构
[1] Reg Nord, Deutsche Stiftung Organtransplant, Hannover, Germany
[2] Thorax Herz & Getasschirug, Med Hochschule, Hannover, Germany
关键词
D O I
暂无
中图分类号
R61 [外科手术学];
学科分类号
摘要
引用
收藏
页码:346 / 347
页数:2
相关论文
共 7 条
  • [1] Should I accept a donation?
    Haig, T
    VETERINARY ECONOMICS, 2003, 44 (09): : 24 - 24
  • [2] WHY SHOULD WE ACCEPT THE NEW INTERNATIONAL CRITERIA FOR THE DIAGNOSIS OF GESTATIONAL DIABETES?
    Krejci, Hana
    Anderlova, Katerina
    Andelova, Katerina
    AKTUALNI GYNEKOLOGIE A PORODNICTVI, 2014, 6 : 95 - 99
  • [3] LUNG CANCER PATIENTS ACCEPT POTENTIALLY RISKY PROCEDURES PERFORMED SOLELY TO DETERMINE OPTIMAL TREATMENT
    Peters, Matthew
    Meggitt, Erica
    Morgan, Lucy
    JOURNAL OF THORACIC ONCOLOGY, 2011, 6 (06) : S1240 - S1241
  • [4] Alveolar recruitment in acute respiratory distress syndrome: should we open the lung (no matter what) or may accept (part of) the lung closed?
    Lorenzo Del Sorbo
    Tommaso Tonetti
    V. Marco Ranieri
    Intensive Care Medicine, 2019, 45 : 1436 - 1439
  • [5] Alveolar recruitment in acute respiratory distress syndrome: should we open the lung (no matter what) or may accept (part of) the lung closed?
    Del Sorbo, Lorenzo
    Tonetti, Tommaso
    Ranieri, V. Marco
    INTENSIVE CARE MEDICINE, 2019, 45 (10) : 1436 - 1439
  • [6] An Audit of Lung Donor Pool: Optimal Current Donation Strategies and the Potential of Novel Time-Extended Donation After Circulatory Death Donation
    Okahara, Shuji
    Levvey, Bronwyn
    McDonald, Mark
    D'Costa, Rohit
    Opdam, Helen
    Pilcher, David, V
    Snell, Gregory, I
    HEART LUNG AND CIRCULATION, 2022, 31 (02): : 285 - 291
  • [7] INCORPORATING PROJECT SPECIFIC CRITERIA AND CLIENT UTILITY INTO THE EVALUATION OF CONSTRUCTION TENDERERS - CHOICE OF CONTRACTOR SHOULD BE MADE ON A VALUE-FOR-MONEY BASIS, RATHER THAN AUTOMATICALLY ACCEPTING THE LOWEST BID, THE AIM SHOULD BE TO ACCEPT THE BEST TENDER - THIS PAPER HELPS SELECTION CONTRACTORS BROADEN THEIR ANALYSIS
    HOLT, GD
    OTOMOLAIYE, PO
    HARRIS, FC
    BUILDING RESEARCH AND INFORMATION, 1994, 22 (04): : 214 - 221