Deployable Bamboo Structure Project: A Building Life-Cycle Report

被引:0
|
作者
Firdaus, Adrian [1 ,3 ]
Prastyatama, Budianastas [2 ,3 ]
Sagara, Altho [1 ,3 ]
Wirabuana, Revian N. [2 ,3 ]
机构
[1] Univ Katolik Parahyangan, Dept Civil Engn, Bandung 40141, Indonesia
[2] Univ Katolik Parahyangan, Dept Architecture, Bandung 40141, Indonesia
[3] Univ Katolik Parahyangan, Sustainable Bldg Mat & Construct Technol Res Ctr, Bandung 40141, Indonesia
关键词
ENGINEERED BAMBOO; DESIGN;
D O I
10.1063/1.5011509
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Integrating BIM with building performance analysis in project life-cycle
    Jin, Ruoyu
    Zhong, Botao
    Ma, Ling
    Hashemi, Arman
    Ding, Lieyun
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 106
  • [2] A study on project life-cycle cost structure system
    Dong, Jianjun
    Chen, Guang
    Lu, Yan
    Cheng, Hu
    [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (02): : 138 - 142
  • [3] Life-cycle building control
    East, E. W.
    Bogen, C.
    Rashid, M.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2012, : 391 - 396
  • [4] A LIFE-CYCLE APPROACH IN BUILDING
    BEKKER, PCF
    [J]. BUILDING AND ENVIRONMENT, 1982, 17 (01) : 55 - 61
  • [5] LIFE-CYCLE ANALYSIS OF AN ADA PROJECT
    BASKETTE, J
    [J]. IEEE SOFTWARE, 1987, 4 (01) : 40 - 47
  • [6] Modelling the living building life-cycle
    Nederveen, S. V.
    Gielingh, W.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTIO N, 2009, : 225 - 230
  • [7] The execution of infrastructure project life-cycle
    Willar, Debby
    Waney, Estrellita V. Y.
    Senduk, Novatus
    [J]. INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS (SCESCM 2018), 2019, 258
  • [8] Life-Cycle Evaluation of Passive Building
    Li, Qiangnian
    Zhao, Lijuan
    [J]. ICCREM 2017: INDUSTRY REGULATION AND SUSTAINABLE DEVELOPMENT, 2017, : 251 - 259
  • [9] Life-cycle cost estimation of a building structure: An example of partition walls
    Biolek, Vojtech
    Hanak, Tomas
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 13 - 26
  • [10] Urban Rail Transit Project Life-Cycle Cost Structure System
    Wang, S.
    Wen, J.
    Ren, R.
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1852 - 1855