Flowshop scheduling with interstage job transportation

被引:11
|
作者
Zhong, Weiya [1 ]
Chen, Zhi-Long [2 ]
机构
[1] Shanghai Univ, Sch Management, Dept Business Adm, Shanghai 200444, Peoples R China
[2] Univ Maryland, Robert H Smith Sch Business, Dept Decis Operat & Informat Technol, College Pk, MD 20742 USA
基金
中国国家自然科学基金;
关键词
Flowshop scheduling; Transportation; Approximation algorithm; 2-STAGE HYBRID FLOWSHOP; 2-MACHINE FLOWSHOP; PARALLEL MACHINES; NP-HARD; STAGE; TIME; SHOP; PERFORMANCE; ALGORITHMS; MAKESPAN;
D O I
10.1007/s10951-014-0409-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There are a variety of joint job production and transportation scheduling problems that arise in modern manufacturing systems. In this paper, we study two such problems that arise in a flowshop environment where there are two processing stages and a single transporter that is available to deliver the finished jobs from the first stage to the second. In the first problem, there is a single machine in each of the two flowshop stages and jobs have different sizes when loaded onto the transporter. In the second problem, there are two parallel machines in the first stage and a single machine in the second stage, and the transporter can carry only one job in each shipment. The objective of both problems is to minimize the makespan, i.e., the completion time of the last job in the second stage. The two problems are both strongly NP-hard. For each problem, we propose a fast heuristic and show that the heuristic has a tight worst-case bound of 2.
引用
收藏
页码:411 / 422
页数:12
相关论文
共 50 条
  • [1] Flowshop scheduling with interstage job transportation
    Weiya Zhong
    Zhi-Long Chen
    [J]. Journal of Scheduling, 2015, 18 : 411 - 422
  • [2] Hybrid Flowshop Scheduling with Interstage Job Transportation
    Zhong W.-Y.
    Lv L.-H.
    [J]. Journal of the Operations Research Society of China, 2014, 2 (1) : 109 - 121
  • [3] INTERSTAGE TRANSPORTATION-PLANNING IN THE DETERMINISTIC FLOWSHOP ENVIRONMENT
    LANGSTON, MA
    [J]. OPERATIONS RESEARCH, 1987, 35 (04) : 556 - 564
  • [4] FLOWSHOP SCHEDULING OF ROBOTIC CELLS WITH JOB-DEPENDENT TRANSPORTATION AND SET-UP EFFECTS
    LEVNER, E
    KOGAN, K
    MAIMON, O
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (12) : 1447 - 1455
  • [5] Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
    Gong, Hua
    Tang, Lixin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1267 - 1274
  • [6] Hybrid Flowshop Scheduling With Finite Transportation Capacity
    Xuan, Hua
    [J]. MECHATRONIC SYSTEMS AND AUTOMATION SYSTEMS, 2011, 65 : 574 - 578
  • [7] Flowshop scheduling with learning effect and job rejection
    Mor, Baruch
    Mosheiov, Gur
    Shapira, Dana
    [J]. JOURNAL OF SCHEDULING, 2020, 23 (06) : 631 - 641
  • [8] Flowshop scheduling with learning effect and job rejection
    Baruch Mor
    Gur Mosheiov
    Dana Shapira
    [J]. Journal of Scheduling, 2020, 23 : 631 - 641
  • [9] A Note on "Flowshop Scheduling with Learning Effectand Job Rejection"
    Yu, Jin
    Liu, Pei-Hai
    Lu, Xi-Wen
    [J]. JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2023,
  • [10] Flowshop scheduling with machine deterioration based on job sequences
    Ruiz-Torres, Alex J.
    Ablanedo-Rosas, Jose
    Jurburg, Daniel
    [J]. INGENIERIA Y COMPETITIVIDAD, 2021, 23 (02):