Research on Pricing Mechanism of Agent Construction for Government Investment Projects based on Risk Allocation

被引:0
|
作者
Yan Min [1 ]
Yan Ling [2 ]
Yin Yilin [2 ]
机构
[1] Tianjin Univ, Sch Management, Tianjin 300072, Peoples R China
[2] Tianjin Univ Technol, Sch Management, Tianjin 300072, Peoples R China
关键词
Agent construction system; incentive mechanism; pricing mechanism; risk allocation; project residual;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The Agent Construction System (ACS) for government investment project is a primary solution for investment system reformation in China. However, the implementation of ACS has encountered some incentive problems, and the agent construction service pricing mechanism is one of the most important incentive problems. By formulating a primary pricing model be comprised of basic price and incentive price, the article discussed the influence of risk allocation on the incentive ratio and parameters in the project residual. It shows that the incentive ratio in the pricing model and the project residual are both determinate by the risk allocation between the principal and the agency. Based on the analysis above, the article has presented a series of pricing model for the government principal in accordance with different risk allocation arrangements.
引用
收藏
页码:1708 / +
页数:2
相关论文
共 50 条
  • [1] RESEARCH ON THE RUNNING MECHANISM AND PERFORMANCE EVALUATION OF CONSTRUCTION AGENT SYSTEM IN GOVERNMENT INVESTMENT PROJECTS
    Bai, Shengling
    Jing, Chao
    Ye, Zhengan
    Lu, Chenyao
    [J]. ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 248 - 254
  • [2] Review of Agent Construction Management for Government Investment Projects
    Yi, Honglei
    Wang, Yousong
    Pang, Yongshi
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3235 - +
  • [3] Explicit Incentive Mechanism of the Agent Construction System for Government Investment Projects: A Model Study Based on Asymmetric Information
    Dai, Da-shuang
    Zhang, Shuang
    Liu, Zi-xin
    Feng, Chao
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 1075 - 1086
  • [4] Research on the Governance Structure of Different Agent-construction System Models in Government Investment Projects
    Jia Chong
    Jin Fang
    Zhao Lei
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (5TH), VOL II, 2009, : 142 - 146
  • [5] Research on the Risk Allocation Mechanism of Agent Construction Project: From the Perspective of Project Ownership Allocation
    Yan Ling
    Zhao Hua
    Zhang Junli
    Fu Wangying
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7503 - 7508
  • [6] Grey evaluation method for achievements of agent construction manager of government investment projects
    School of Civil Engineering, Wuhan University, Wuhan 430072, China
    [J]. Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban), 2008, 2 (305-308):
  • [7] Computation of Risk in Pricing of Investment Projects
    Raeva, I
    [J]. APPLICATION OF MATHEMATICS IN TECHNICAL AND NATURAL SCIENCES, 2019, 2164
  • [8] Studies on Problems and Countermeasures of Agent Construction System in Chinese government investment projects -Based on the Incentive perspective
    Cai, Yuancheng
    Zhao, Min
    [J]. 2012 WORLD AUTOMATION CONGRESS (WAC), 2012,
  • [9] Risk Allocation in Construction Projects for Government-Linked Company (GLC)
    Ab Rani, Nur Izzati
    Razak, Muhammad Taufiq
    Nusa, Fatin Najwa Mohd
    Isa, Che Maznah Mat
    Mustaffa, Nur Kamaliah
    [J]. 2020 11TH IEEE CONTROL AND SYSTEM GRADUATE RESEARCH COLLOQUIUM (ICSGRC), 2020, : 265 - 270
  • [10] Research Frame for Incentive Mechanism of the Construction Agent in Government Investment Project: from the Perspective of Project Governance
    Yan Ling
    Yang Linggang
    Zhao Hua
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1513 - 1517