SIMULTANEOUS MANAGEMENT OF ECONOMICS AND BUSINESS PROCESSES BY ADDED VALUE KNOWLEDGE

被引:0
|
作者
Rajnoha, Rastislav [1 ]
Dobrovic, Jan [2 ]
机构
[1] Tech Univ Zvolene, Drevarska Fak, Katedra Podnikoveho Hospodarstva, Zvolen 96053, Slovakia
[2] Presovska Univ Presove, Fak Manazmentu, Katedra Manazmentu, Presov 08078, Slovakia
来源
E & M EKONOMIE A MANAGEMENT | 2011年 / 14卷 / 01期
关键词
value added; economic value added; process management; activity based planning; budgeting and costing; controlling; efficiency;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many consultant companies dealing with the implementation of costing and calculation systems offer alternative calculation systems based on performed activities and processes - so called Activity Based Costing systems (ABC). Managers must decide which conception they would apply in their companies. The system of Activity Based Costing brings economical effects, but it requires higher demands on information database by special software and therefore it results in higher investment expenditures for its purchase and application. Besides the ABC model implementation is there very important to integrate into this process of continuous improvement of enterprise efficiency the measures in the area of added value raising by single processes through process identification, which in the whole production process don't bring the added value. On the base of our methodology and reached results we can recommend implementation of alternative calculation system based on performed processes and reflected the economic value added and value added index. How it results from the presented research paper, from the efficiency of enterprise processes point of view it does not to monitor and manage only the economic value added (EVA), it is necessary to confront it wit the efficiency and processes value added, calculated on the basis of value added index (VAi), that map the real value flow in the complex enterprise processes. Presented conception of added value management there is not possible to realise without the applicable costing methodology, based on ABC principle.
引用
收藏
页码:53 / 69
页数:17
相关论文
共 50 条
  • [1] Management and economics of business processes added value
    Rajnoha, Rastislav
    Sujova, Andrea
    Dobrovic, Jan
    [J]. WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012), 2012, 62 : 1292 - 1296
  • [2] Influence of Knowledge Management on Business Processes: Value-Added and Sustainability Perspectives
    Atkociuniene, Zenona Ona
    Gribovskis, Justas
    Raudeliuniene, Jurgita
    [J]. SUSTAINABILITY, 2023, 15 (01)
  • [3] ECONOMIC VALUE ADDED IN BUSINESS ECONOMICS
    Rylkova, Zaneta
    [J]. HRADEC ECONOMIC DAYS, VOL 6, ISSUE 1, 2016, 6 : 903 - 909
  • [4] The Business Value of Knowledge Management
    Ryan, Sherry D.
    Harden, Gina
    Ibragimova, Bashorat
    Windsor, John C.
    [J]. AMCIS 2012 PROCEEDINGS, 2012,
  • [5] Management of knowledge intensive business processes
    Gronau, N
    Weber, E
    [J]. BUSINESS PROCESS MANAGEMENT, 2004, 3080 : 163 - 178
  • [6] Integrating knowledge management into business processes
    Hawryszkiewycz, I. T.
    Maung, Win
    [J]. Managing Knowledge with Technology, 2004, : 141 - 151
  • [7] KNOWLEDGE MANAGEMENT AND THE CREATION OF BUSINESS VALUE
    Mousavizadeh, Mohammadreza
    Harden, Gina
    Ryan, Sherry
    Windsor, John
    [J]. JOURNAL OF COMPUTER INFORMATION SYSTEMS, 2015, 55 (04) : 35 - 45
  • [8] Economic value added (EVA) as a business management tool
    Kopacz, Michal
    Kicki, Jerzy
    Saluga, Piotr
    Sobczyk, Jacek
    [J]. Progress in Mining Science and Safety Technology, Pts A and B, 2007, : 2866 - 2873
  • [9] Reengineering business processes: A complexity theory approach to value added
    Housel, T
    Kanevsky, VA
    [J]. INFOR, 1995, 33 (04) : 248 - 262
  • [10] The added value of facilities management: benchmarking work processes
    Wauters, Bram
    [J]. FACILITIES, 2005, 23 (3-4) : 142 - 151