MULTI PROJECT SCHEDULING IN THE CHEMICAL INDUSTRY USING A GENETIC ALGORITHM

被引:0
|
作者
Tackenberg, Sven [1 ]
Schneider, Sebastian [1 ]
Schlick, Christopher M. [1 ]
机构
[1] Rhein Westfal TH Aachen, Chair Ind Engn & Ergon, Bergdriesch 27, Aachen, Germany
关键词
Project Management; Resource Constraint Multi Project Scheduling Problem (RCMPSP); Genetic Algorithm (GA); C3; Model; Task Scheduling;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Due to impatient customers and competitive threats, it has become increasingly important for the chemical industry to shorten the lead time of development projects. Furthermore, these organizations are faced with the challenge of planning and managing the simultaneous execution of multiple dependent projects under tight time and resource constraints. Within that kind of business environment, effective project management and task scheduling is crucial to organizational performance. A genetic algorithm approach with a novel genotype and GP mapping operation is presented to minimize the overall project duration and budget of multiple projects for a resource constrained multi project scheduling problem (RCMPSP) without violating inter-project resource constraints or intra-project precedence constraints. The C3 representation was used to model the processes due to its compact, generic and easily quantifiable nature. The implemented system is capable of calculating a number of project performance metrics that are focused towards determining the effect of stochastic rework of tasks, variable assignment of actors and the stochastic makespan for a specific task. The proposed Genetic Algorithm is tested on scheduling problems with and without stochastic feedback. This GA demonstrates to provide a quick convergence to a global optimal solution regarding the multi-criteria objectives.
引用
收藏
页码:332 / +
页数:4
相关论文
共 50 条
  • [1] Multi-project scheduling using an heuristic and a genetic algorithm
    Kumanan, S.
    Jegan Jose, G.
    Raja, K.
    [J]. International Journal of Advanced Manufacturing Technology, 2006, 31 (3-4): : 360 - 366
  • [2] Multi-project scheduling using an heuristic and a genetic algorithm
    Kumanan, S.
    Jose, G. Jegan
    Raja, K.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4): : 360 - 366
  • [3] Multi-project scheduling using an heuristic and a genetic algorithm
    S. Kumanan
    G. Jegan Jose
    K. Raja
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 31 : 360 - 366
  • [4] Project scheduling using a competitive genetic algorithm
    Magalhaes-Mendes, J.
    [J]. SMO 08: PROCEEDINGS OF THE 8TH WSEAS INTERNATIONAL CONFERENCE ON SIMULATION, MODELLING AND OPTIMIZATION, 2008, : 39 - +
  • [5] Project scheduling with limited resources using a genetic algorithm
    Montoya-Torres, Jairo R.
    Gutierrez-Franco, Edgar
    Pirachican-Mayorga, Carolina
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (06) : 619 - 628
  • [6] Project scheduling using a genetic algorithm with adaptable changing genetic operators
    Ikeuchi, T.
    Ikkai, Y.
    Araki, D.
    Ohkawa, T.
    Komoda, N.
    [J]. Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi), 1998, 124 (02): : 36 - 42
  • [7] Project scheduling using a genetic algorithm with adaptable changing genetic operators
    Ikeuchi, T
    Ikkai, Y
    Araki, D
    Ohkawa, T
    Komoda, N
    [J]. ELECTRICAL ENGINEERING IN JAPAN, 1998, 124 (02) : 36 - 42
  • [8] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [9] A Multi-objective Genetic Algorithm for the Software Project Scheduling Problem
    Garcia-Najera, Abel
    del Carmen Gomez-Fuentes, Maria
    [J]. NATURE-INSPIRED COMPUTATION AND MACHINE LEARNING, PT II, 2014, 8857 : 13 - 24
  • [10] Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm
    Samuel, Biju
    Mathew, Jeeno
    [J]. INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN MATERIALS, MECHANICAL AND CIVIL ENGINEERING, 2018, 330