Modelling optimal risk allocation in PPP projects using artificial neural networks

被引:171
|
作者
Jin, Xiao-Hua [1 ]
Zhang, Guomin
机构
[1] Deakin Univ, Sch Architecture & Bldg, Fac Sci & Technol, Geelong, Vic 3217, Australia
关键词
Risk allocation; Transaction cost economics; Artificial neural networks; PPP/PFI; Australia; INSTITUTIONAL STRUCTURE; TRANSACTION COST; CONSTRUCTION; FIRM; PRODUCTIVITY; CAPABILITIES; PERFORMANCE; FRAMEWORK; STRATEGY; VIEW;
D O I
10.1016/j.ijproman.2010.07.011
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper aims to establish, train, validate, and test artificial neural network (ANN) models for modelling risk allocation decision-making process in public private partnership (PPP) projects, mainly drawing upon transaction cost economics. An industry-wide questionnaire survey was conducted to examine the risk allocation practice in PPP projects and collect the data for training the ANN models. The training and evaluation results, when compared with those of using traditional MLR modelling technique, show that the ANN models are satisfactory for modelling risk allocation decision-making process. The empirical evidence further verifies that it is appropriate to utilize transaction cost economics to interpret risk allocation decision-making process. It is recommended that, in addition to partners' risk management mechanism maturity level, decision-makers, both from public and private sectors, should also seriously consider influential factors including partner's risk management routines, partners' cooperation history, partners' risk management commitment, and risk management environmental uncertainty. All these factors influence the formation of optimal risk allocation strategies, either by their individual or interacting effects. (C) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:591 / 603
页数:13
相关论文
共 50 条
  • [1] The allocation of risk in PPP construction projects
    Cao, Yubo
    Zhang, Lianying
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 285 - 292
  • [2] Evidence on optimal risk allocation models for Indonesian geothermal projects under PPP contracts
    Nur, Suardi
    Burton, Bruce
    Bergmann, Ariel
    [J]. UTILITIES POLICY, 2023, 81
  • [3] Hydrological modelling using artificial neural networks
    Dawson, CW
    Wilby, RL
    [J]. PROGRESS IN PHYSICAL GEOGRAPHY-EARTH AND ENVIRONMENT, 2001, 25 (01): : 80 - 108
  • [4] On the Usage of Artificial Neural Networks for the Determination of Optimal Wind Farms Allocation
    Xenitidis, Kleanthis
    Ioannou, Konstantinos
    Tsantopoulos, Georgios
    Myronidis, Dimitrios
    [J]. SUSTAINABILITY, 2023, 15 (24)
  • [5] Equitable Risk Allocation in Chinese PPP Power Projects
    Ke Yongjian
    Wang ShouQing
    Chan, Albert
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 47 - 51
  • [6] Risk Allocation Inefficiencies in Chinese PPP Water Projects
    Shrestha, Asheem
    Chan, Toong-Khuan
    Aibinu, Ajibade A.
    Chen, Chuan
    Martek, Igor
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (04)
  • [7] MODELLING OF THE DYNAMICS OF A GYROSCOPE USING ARTIFICIAL NEURAL NETWORKS
    Lacny, Lukasz
    [J]. JOURNAL OF THEORETICAL AND APPLIED MECHANICS, 2012, 50 (01) : 85 - 97
  • [8] Estuarine flood modelling using Artificial Neural Networks
    Fazel, Seyyed Adel Alavi
    Blumenstein, Michael
    Mirfenderesk, Hamid
    Tomlinson, Rodger
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2014, : 631 - 637
  • [9] Business process modelling using artificial neural networks
    Wright, DT
    Burns, ND
    Williams, DJ
    [J]. ADVANCED MANUFACTURING PROCESSES, SYSTEMS, AND TECHNOLOGIES (AMPST 96), 1996, : 37 - 46
  • [10] Modelling of jute production using artificial neural networks
    Rahman, M. M.
    Bala, B. K.
    [J]. BIOSYSTEMS ENGINEERING, 2010, 105 (03) : 350 - 356