共 50 条
- [1] SEVERN BRIDGE - FABRICATION AND ERECTION PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1968, 41 (SEP): : 69 - &
- [2] ADVANCED FABRICATION AND ERECTION TECHNIQUES FOR LONG SUSPENSION BRIDGE CABLES JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (01): : 112 - 129
- [3] ADVANCED FABRICATION AND ERECTION TECHNIQUES FOR LONG SUSPENSION BRIDGE CABLES - DISCUSSION JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01): : 200 - 205
- [4] Rande Bridge Expansion. Erection Process of the New Deck HORMIGON Y ACERO, 2022, 73 (298): : 25 - 34
- [5] FABRICATION AND ERECTION CONTROLS TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1945, 110 : 50 - 81
- [6] TORRIDGE BRIDGE - ERECTION OF SUPERSTRUCTURE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1990, 88 : 233 - 260
- [8] The Oeresund Bridge, erection of the superstructure 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 98 - 105
- [9] The Oeresund bridge, erection of the superstructure 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 98 - 105
- [10] The El-Ferdan Bridge. Design, fabrication and erection of the longest span swing bridge in the world across the Suez Canal 1600, Ernst and Sohn (70):