共 50 条
- [1] Targetry at the LANL 100 MEV isotope production facility: Lessons learned from facility commissioning. [J]. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2005, 229 : U308 - U309
- [2] Shielding studies for the LANL Isotope Production Facility [J]. PROCEEDINGS OF THE TOPICAL MEETING ON RADIATION PROTECTION FOR OUR NATIONAL PRIORITIES: MEDICINE, THE ENVIRONMENT, AND THE LEGACY, 2000, : 161 - 168
- [3] TRIUMF 500-MEV, 100-MU-A ISOTOPE PRODUCTION FACILITY [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 33 (NOV): : 921 - 922
- [5] Production control at the LANL plutonium facility [J]. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2007, 234
- [6] TARGET INSERTION AND HANDLING SYSTEM FOR ISOTOPE PRODUCTION FACILITY [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 30 (NOV): : 781 - 781
- [7] RADIOACTIVE GAS PRODUCTION AT A 100-MEV ELECTRON LINAC FACILITY [J]. HEALTH PHYSICS, 1967, 13 (08): : 869 - +
- [8] Isotope production at the Los Alamos Isotope Production Facility [J]. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2010, 240
- [9] Target design considerations for isotope production with high intensity 200 MeV protons [J]. Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 1997, 397 (01): : 18 - 21
- [10] Target design considerations for isotope production with high intensity 200 MeV protons [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1997, 397 (01): : 18 - 21