共 50 条
- [1] Metallurgical optimisation after the replacement of two BOF vessels at Dillinger Hutte/Germany [J]. OXYGEN IN STEELMAKING, 2004, : 51 - 63
- [3] Heavy plate Manufacturer wants to build complete Steel foundations. Dillinger Hutte invested in Offshore Wind turbines [J]. STAHL UND EISEN, 2011, 131 (10): : 16 - 16
- [5] The LEANWIND suite of logistics optimisation and full lifecycle simulation models for offshore wind farms [J]. EERA DEEPWIND'2018, 15TH DEEP SEA OFFSHORE WIND R&D CONFERENCE, 2018, 1104
- [6] Optimisation of Sports Performance Using Computer Simulation Models [J]. PROCEEDINGS OF FIRST JOINT INTERNATIONAL PRE-OLYMPIC CONFERENCE OF SPORTS SCIENCE AND SPORTS ENGINEERING, VOL II: BIO-MECHANICS AND SPORTS ENGINEERING, 2008, : 112 - 115
- [7] NEW OXYGEN (TOP BLOWING) STEEL PLANT OF AUGUST THYSSEN-HUTTE AG [J]. STAHL UND EISEN, 1970, 90 (02): : 53 - &
- [8] NEW OXYGEN TOP-BLOWING STEEL PLANT OF DILLINGER-HUTTENWERKE-AG [J]. STAHL UND EISEN, 1970, 90 (08): : 389 - &
- [9] Multi-mode logistics optimization in slab yard of steel plant based on simulation [J]. ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 1809 - 1813
- [10] Integrating partner objectives in horizontal logistics optimisation models [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2019, 82 : 1 - 12