Optimal Rules for Single Machine Scheduling with Stochastic Breakdowns

被引:1
|
作者
Gu, Jinwei [1 ]
Gu, Manzhan [2 ,3 ]
Gu, Xingsheng [4 ]
机构
[1] Shanghai Univ Elect Power, Sch Econ & Management, Shanghai 200090, Peoples R China
[2] Shanghai Univ Finance & Econ, Sch Math, Shanghai 200433, Peoples R China
[3] Georgia Inst Technol, Sch Elect & Comp Engn, Savannah, GA 31407 USA
[4] E China Univ Sci & Technol, Res Inst Automat, Shanghai 200237, Peoples R China
基金
中国国家自然科学基金;
关键词
SUBJECT; MINIMIZE; EARLINESS;
D O I
10.1155/2014/260415
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies the problem of scheduling a set of jobs on a single machine subject to stochastic breakdowns, where jobs have to be restarted if preemptions occur because of breakdowns. The breakdown process of the machine is independent of the jobs processed on the machine. The processing times required to complete the jobs are constants if no breakdown occurs. The machine uptimes are independently and identically distributed (i.i.d.) and are subject to a uniform distribution. It is proved that the Longest Processing Time first (LPT) rule minimizes the expected makespan. For the large-scale problem, it is also showed that the Shortest Processing Time first (SPT) rule is optimal to minimize the expected total completion times of all jobs.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] SINGLE-MACHINE SCHEDULING SUBJECT TO STOCHASTIC BREAKDOWNS
    BIRGE, J
    FRENK, JBG
    MITTENTHAL, J
    KAN, AHGR
    [J]. NAVAL RESEARCH LOGISTICS, 1990, 37 (05) : 661 - 677
  • [2] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    TANG HengYong~+ ZHAO ChuanLi CHENG CongDian College of Mathematics and Systems Science
    [J]. Science China Mathematics, 2008, (02) : 273 - 292
  • [3] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    HengYong Tang
    ChuanLi Zhao
    CongDian Cheng
    [J]. Science in China Series A: Mathematics, 2008, 51 : 273 - 292
  • [4] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    Tang HengYong
    Zhao ChuanLi
    Cheng CongDian
    [J]. SCIENCE IN CHINA SERIES A-MATHEMATICS, 2008, 51 (02): : 273 - 292
  • [5] SCHEDULING STOCHASTIC JOBS ON A SINGLE-MACHINE SUBJECT TO BREAKDOWNS
    GLAZEBROOK, KD
    [J]. NAVAL RESEARCH LOGISTICS, 1984, 31 (02) : 251 - 264
  • [6] ASSESSING THE EFFECTS OF MACHINE BREAKDOWNS IN STOCHASTIC SCHEDULING
    BIRGE, JR
    GLAZEBROOK, KD
    [J]. OPERATIONS RESEARCH LETTERS, 1988, 7 (06) : 267 - 271
  • [7] A Note on Single Machine Scheduling Subject to Stochastic Breakdowns with Regular Cost Functions
    Cheng, Congdian
    Zhang, Lihua
    Tang, Henyong
    Zhao, Chuanli
    [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2576 - 2581
  • [8] Dynamically optimal policies for stochastic scheduling subject to preemptive-repeat machine breakdowns
    Cai, XQ
    Wu, XY
    Zhou, X
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2005, 2 (02) : 158 - 172
  • [9] EVALUATING THE EFFECTS OF MACHINE BREAKDOWNS IN STOCHASTIC SCHEDULING PROBLEMS
    GLAZEBROOK, KD
    [J]. NAVAL RESEARCH LOGISTICS, 1987, 34 (03) : 319 - 335
  • [10] Predictive Scheduling for a Single Machine with Random Machine Breakdowns
    Zhu, Hongli
    Zhou, Hong
    [J]. LISS 2013, 2015, : 753 - 758