Reckon Model for Development Cost on Improved GM(1,N)

被引:0
|
作者
Zhang Lin [1 ]
Fan Wenxin [2 ]
Yuan Zhi-shu [3 ]
机构
[1] AFFU, Missile Inst, Sanyuan 710038, Shanxi, Peoples R China
[2] CETC, Inst 20, Xian 710000, Shanxi, Peoples R China
[3] CETC, Mil Deputy Inst, Beijing 10000, Peoples R China
关键词
development cost; anticipation; improved GM(1; N);
D O I
暂无
中图分类号
K9 [地理];
学科分类号
0705 ;
摘要
To solve the question that the real cost data are few and the influence factors are many at the development cost estimation. By way of joining the residual error forecast to GM (1,N), builds the upswing GM (1,N) model. By it anticipating (7)the development cost, the result shows that the model is reasonable and feasible.
引用
收藏
页码:763 / +
页数:2
相关论文
共 50 条
  • [1] Improved GM(1,N) Model for Equipment Development Cost Prediction
    Zhang, Changcong
    Liu, Qinghua
    Fang, Qiqing
    Xia, Liang
    Hou, Xiaodong
    [J]. 2019 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-QINGDAO), 2019,
  • [2] Development of an optimization method for the GM(1,N) model
    Zeng, Bo
    Luo, Chengming
    Liu, Sifeng
    Bai, Yun
    Li, Chuan
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2016, 55 : 353 - 362
  • [3] Estimating a civil aircraft's development cost with a GM(1, N) model and an MLP neural network
    Nai-ming Xie
    Song-Ming Yin
    Chuan-Zhen Hu
    [J]. GREY SYSTEMS-THEORY AND APPLICATION, 2017, 7 (01) : 2 - 18
  • [4] The Cost Study of Large Airplanes Based on GM (1, N) Model
    Cui Bo
    Pan Shunrong
    [J]. DATA PROCESSING AND QUANTITATIVE ECONOMY MODELING, 2010, : 487 - 493
  • [5] Grey dynamic model GM(1,N) for the relationship of cost and variability
    Luo Youxin
    Wu Xiao
    Li Min
    Cai Anhui
    [J]. KYBERNETES, 2009, 38 (3-4) : 435 - 440
  • [6] Development Cost Estimation of Civil Aircraft Based on Combination Model of GM (1, N) and MLP Neural Network
    Yin Songming
    Xie Naiming
    Hu Chuanzhen
    [J]. PROCEEDINGS OF 2015 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES (GSIS), 2015, : 312 - 317
  • [7] An improved method on GM(1,1) model
    Zuo Jihong
    Hu Shuhua
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2345 - 2348
  • [8] Improved algorithm for GM (1, 1) model and its application
    Li, Hong-Kun
    Zhao, Chang-Sheng
    Guo, Cheng
    Zhao, Li-Hua
    [J]. Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2011, 51 (06): : 814 - 818
  • [9] On the Improved GM(1,1) Model Based on Concave Sequences
    Kong, Xinhai
    Ma, Xin
    [J]. PROCEEDINGS OF 2017 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES (GSIS), 2017, : 150 - 151
  • [10] Forecasting Clean Energy Consumption in China by 2025: Using Improved Grey Model GM (1, N)
    Cheng, Maolin
    Li, Jiano
    Liu, Yun
    Liu, Bin
    [J]. SUSTAINABILITY, 2020, 12 (02)