Public Hospital Facilities Development Using Build-Operate-Transfer Approach: Policy Consideration for Developing Countries

被引:0
|
作者
Pourasghari, Hamid [1 ]
Jafari, Mehdi [1 ]
Gorji, Hasan Abolghasem [1 ,2 ]
Maleki, Mohammadreza [1 ,3 ]
机构
[1] Iran Univ Med Sci, Sch Hlth Management & Informat Sci, Dept Hlth Serv Management, Tehran, Iran
[2] Iran Univ Med Sci, Sch Hlth Management & Informat Sci, Ctr Excellence Hlth Management & Econ, Tehran, Iran
[3] Iran Univ Med Sci, Hlth Management & Econ Res Ctr, Tehran, Iran
关键词
Public-Private Partnerships; Health Care Sector; Health Care Facilities; SUSTAINABLE TELEMEDICINE PROGRAMS; PRIVATE PARTNERSHIPS; MANAGEMENT; STRATEGY;
D O I
10.5812/ircmj.39866
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
Background: Advantages and limitations of build-operate-transfer (BOT) contracts in various forms of public-private partnership (PPP) arrangements have not been studied. Objectives: This study is the first of its kind to determine the framework, advantages, and limitations of BOT contracts for health care projects in selected countries. Methods: A comparative design was employed to identify factors affecting the development of medical facilities through the adoption of PPPs and the implementation of BOT contracts. England, Spain, Australia, Turkey, and Canada were selected, and data were gathered through well-known databases for the relevant studies. Electronic databases were searched using the keyword terms, "build-operate-transfer," "public-private partnerships," "health sector/health system," "health care facilities," "Spain," "Canada," "England or United Kingdom," "Turkey," and "Australia." Results: The findings revealed that while there was insufficient information transparency for adoption of the BOT contract model in developing medical facilities and building new hospitals, some similarities were observed in its adoption in public fields. Adoption of the BOT contract model has been proven feasible in the selected countries for the health sector, in particular, for the development of new hospitals. These contracts are usually long-term in nature to provide the private sector with the chance to appropriately exploit the field. Different countries utilize this model to meet public regional and long-term health care needs, where the goal is not just a matter of seeking the private sector's contribution. Conclusions: This study suggests that more information transparency is required for these types of contracts. Factors such as the term of the contract, the maintenance of the facilities built and their post-completion ownership status, facilities and credits offered to the private sector during the construction and operation phases, and the provision of financial and non-financial incentives to the private sector require deeper examination and should also be adjusted to the local contexts of the developing country.
引用
收藏
页数:7
相关论文
共 34 条
  • [1] Public Financing into Build-Operate-Transfer Hospital Projects in Italy
    De Marco, Alberto
    Mangano, Giulio
    Cagliano, Anna Corinna
    Grimaldi, Sabrina
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (11) : 1294 - 1302
  • [2] Modeling ceiling price for build-operate-transfer road projects in developing countries
    Nguyen Hoang-Tung
    Do Viet Hung
    Kato, Hironori
    Phan Le Binh
    [J]. ECONOMICS OF TRANSPORTATION, 2021, 28
  • [3] Multistage planning of electric transit charging facilities under build-operate-transfer model
    Li, Meng
    Tang, Peng
    Lin, Xi
    He, Fang
    [J]. TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2022, 102
  • [4] Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects
    Zhang, XQ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (10): : 1054 - 1064
  • [5] Risk factors associated with procuring university hostel facilities through build-operate-transfer model
    Opawole, Akintayo
    Kajimo-Shakantu, Kahilu
    Alao, Oluwaseyi Olalekan
    Ogbaje, Chinanu Patience
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 17 (01) : 136 - 154
  • [6] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, MAU
    Kaysi, IA
    Schoucair, MS
    [J]. CONSTRUCTION 2001: MATERIALS AND CONSTRUCTION, 2001, (1761): : 137 - 147
  • [7] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, Mohamed-Asem U.
    Kaysi, Isam A.
    Schoucair, Marwan S.
    [J]. Transportation Research Record, 2001, (1761) : 137 - 147
  • [8] Capital structure optimization for build-operate-transfer (BOT) projects using a stochastic and multi-objective approach
    Yun, Sungmin
    Han, Seung Heon
    Kim, Hyoungkwan
    Ock, Jong Ho
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (05) : 777 - 790
  • [9] Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
    Kang, CC
    Feng, CM
    Khan, HA
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (06) : 1633 - 1654
  • [10] Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects
    Okudan, Ozan
    Budayan, Cenk
    Dikmen, Irem
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (06) : 1635 - 1656