Quality assurance of hot-mix asphalt - Comparison of contractor quality control and Georgia Department of Transportation Data

被引:0
|
作者
Turochy, Rod E. [1 ]
Willis, J. Richard [1 ]
Parker, Frazier [1 ]
机构
[1] Auburn Univ, Dept Civil Engn, Auburn, AL 36849 USA
来源
CONSTRUCTION 2006 | 2006年 / 1946期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Quality assurance is the process by which highway construction elements are sampled and tested to ensure compliance with specifications and other project requirements. The results of contractor-performed tests, originally performed for quality control purposes, are increasingly used in the acceptance decision in many states. The Georgia Department of Transportation (GDOT) uses contractor-performed tests in the acceptance decision on acceptable corroboration of GDOT-performed tests. Statistical analyses were performed to assess differences between tests conducted on hot-mix asphalt concrete by GDOT and its contractors during the 2003 construction season. Measurements of gradation and asphalt content taken by both parties were compared both across all projects and on a project-by-project basis for projects large enough to meet sample size requirements for this type of analysis. Both tabular and graphic representations of data are used to interpret the results. Statistically significant differences occur in some cases; these differences are much more common when comparing variability of these measurements than with the means. At the project level, on most projects in which statistically significant differences occur, the GDOT value typically is larger.
引用
收藏
页码:47 / 54
页数:8
相关论文
共 50 条
  • [1] Statistics for superpave hot-mix asphalt construction quality, control/quality assurance data
    Parker, F
    Hossain, MS
    [J]. CONSTRUCTION 2002: MATERIALS AND CONSTRUCTION, 2002, (1813): : 151 - 156
  • [2] Quality assurance of mix properties of hot-mix asphalt concrete - Multistate analysis comparing contractor and state transportation agency test results
    Turochy, Rod E.
    Parker, Frazier
    [J]. TRANSPORTATION RESEARCH RECORD, 2007, (2040) : 33 - 40
  • [3] Quality Control-Quality Assurance Sampling Strategies for Hot-Mix Asphalt Construction
    Tsai, Bor-Wen
    Monismith, Carl L.
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2098) : 51 - 62
  • [4] Summary of current quality control/quality assurance practices for hot-mix asphalt construction
    Schmitt, RL
    Russell, JS
    Hanna, AS
    Bahia, HU
    Jung, GA
    [J]. CONSTRUCTION QUALITY AND MANAGEMENT, 1998, (1632): : 22 - 31
  • [5] Comparisons of contractor and state transportation agency quality assurance test results on mat density of hot-mix asphalt concrete - Findings of multistate analysis
    Turochy, Rod E.
    Parker, Frazier
    [J]. TRANSPORTATION RESEARCH RECORD, 2007, (2040) : 41 - 47
  • [6] Evaluation of rapid triaxial test in quality control of hot-mix asphalt
    Gould, JS
    Nanagiri, YV
    Mallick, RB
    Petruccelli, JD
    Crockford, WC
    [J]. BITUMINOUS PAVING MIXTURES 2003: MATERIALS AND CONSTRUCTION, 2003, (1832): : 191 - 200
  • [7] Ground Penetrating Radar as a Quality Assurance Tool in Hot-Mix Asphalt Road Construction
    Wilson, Bryan
    Devadast, Arvind
    Lytton, Robert
    Sebesta, Stephen
    [J]. MATERIALS EVALUATION, 2020, 78 (10) : 1129 - 1139
  • [8] Initial ride quality of hot-mix asphalt pavements
    Stroup-Gardiner, M
    Carter, A
    Das, T
    Bowman, B
    [J]. CONSTRUCTION 2005, 2005, (1907): : 105 - 112
  • [9] Seismic testing to determine quality of hot-mix asphalt
    Celaya, Manuel
    Nazarian, Soheil
    [J]. CONSTRUCTION 2006, 2006, (1946): : 113 - 122
  • [10] Improving Quality Control of Hot-Mix Asphalt Paving with Intelligent Compaction Technology
    Horan, Robert D.
    Chang, George K.
    Xu, Qinwu
    Gallivan, Victor L.
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2268) : 82 - 91