Economic benefits of road widening: Discrepancy between outturn and forecast

被引:9
|
作者
Metz, David [1 ]
机构
[1] UCL, Ctr Transport Studies, Gower St, London WC1E 6BT, England
关键词
Time saving; Variable demand model; Traffic flow; Economic benefit; TRAVEL-TIME; MYTH;
D O I
10.1016/j.tra.2021.03.023
中图分类号
F [经济];
学科分类号
02 ;
摘要
Cost-benefit analysis of road investments involves models that generate travel time savings as the main economic benefit. Monitoring of traffic flows after the widening of the section of the M25 London orbital motorway between Junctions 23 and 27 found substantial increases in traffic volumes, of up to 23% two to three years after opening, but no increase in speed of travel beyond the first year. Comparison was made with the forecast traffic flows, made using a variable demand model based on SATURN software. The model projected increased traffic volumes and speeds as a consequence of road widening, but underestimated traffic volumes and overestimated traffic speeds compared to outturn. The forecast of faster traffic speeds was the input to the economic model used to compare investment benefits with costs, yielding a benefit-cost ratio of 2.9, which justified the investment. However, the absence of observed increase in traffic speed raises questions about the applicability of a long-established transport model and of travel time savings as the main economic benefit of road investment, as well as about the value of investment to increase the capacity of strategic roads where these are used extensively for local trips.
引用
收藏
页码:312 / 319
页数:8
相关论文
共 50 条
  • [1] Digital navigation negates the economic benefits of road widening: The case of the M1 motorway
    Metz, David
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2023, 174
  • [2] Conservation and economic benefits of a road around the Serengeti
    Hopcraft, J. Grant C.
    Mduma, Simon A. R.
    Borner, Markus
    Bigurube, Gerald
    Kijazi, Alain
    Haydon, Daniel T.
    Wakilema, William
    Rentsch, Dennis
    Sinclair, A. R. E.
    Dobson, Andrew
    Lembeli, James Daudi
    CONSERVATION BIOLOGY, 2015, 29 (03) : 932 - 936
  • [3] Comparison between responses of reinforced and unreinforced embankments due to road widening
    Xiao-ming Huang
    Hao Wang
    Journal of Central South University of Technology, 2009, 16 : 857 - 864
  • [4] Comparison between responses of reinforced and unreinforced embankments due to road widening
    黄晓明
    汪浩
    JournalofCentralSouthUniversityofTechnology, 2009, 16 (05) : 857 - 864
  • [5] Comparison between responses of reinforced and unreinforced embankments due to road widening
    Huang Xiao-ming
    Wang Hao
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2009, 16 (05): : 857 - 864
  • [6] Analysis and Forecast of Regional Freight Characteristics in the Silk Road Economic Belt
    Wang, Jianqiang
    Huang, Zhipeng
    INFORMATION TECHNOLOGY AND INTELLIGENT TRANSPORTATION SYSTEMS, VOL 2, 2017, 455 : 53 - 63
  • [7] A DUAL ECONOMIC-ANALYSIS OF THE BENEFITS OF THE PUBLIC ROAD NETWORK
    SEITZ, H
    ANNALS OF REGIONAL SCIENCE, 1993, 27 (03): : 223 - 239
  • [8] Analysis of social and economic benefits of road transport security investment
    Liu, Q.
    Dissanayake, S.
    Advances in Transportation Studies, 2021, 2021 (Special issue 1): : 135 - 142
  • [9] Neural networks optimized by genetic algorithm used in strategy of the road economic forecast
    Yang, Guang
    Tian, Jinxin
    Sun, Hongbin
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 1701 - 1704
  • [10] Examining the Discrepancy between Forecast and Observed Liquefaction from the 2015 Gorkha, Nepal, Earthquakes
    Moss, Robb Eric S.
    Baise, Laurie G.
    Zhu, Jing
    Kadkha, Diwakar
    EARTHQUAKE SPECTRA, 2017, 33 : S73 - S83