Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework

被引:0
|
作者
Chiu, Yuan-Shyi Peter [1 ]
Lin, Hong-Dar [1 ]
Cheng, Feng-Tsung [2 ]
Hwang, Ming-Hon [3 ]
机构
[1] Chaoyang Univ Technol, Dept Ind Engn & Management, Chaoyang, Taiwan
[2] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung, Taiwan
[3] Chaoyang Univ Technol, Dept Mkt & Logist Management, Chaoyang, Liaoning, Taiwan
来源
关键词
multi-item production; optimization; common cycle time; failure in rework; scrap; multi-shipment; LOT-SIZE PROBLEM; REPLENISHMENT POLICY; QUALITY-ASSURANCE; MULTIPLE SHIPMENTS; ALGEBRAIC APPROACH; MACHINE BREAKDOWN; INVENTORY MODEL; SIZING PROBLEMS; BATCH SIZE; EMQ MODEL;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study is concerned with the optimal common cycle time for a multi-item production system with discontinuous delivery and failure in rework. In real life manufacturing environments; managements often plan to produce multiple products in turn on a single machine in order to maximize machine utilization. Also, dealing with random defective items during production seems to be an inevitable task, and the multi-delivery policy is commonly adopted to distribute the finished products to buyers. The objective of this study is to determine the optimal common production cycle that minimizes the total production-inventory-delivery costs per unit time for a multi-item production system with failure in rework and multi-delivery policy. Mathematical modeling along with an optimization procedure is used to derive the optimal common cycle time for the aforementioned production problem.
引用
收藏
页码:435 / 440
页数:6
相关论文
共 50 条
  • [1] Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework
    Chiu, Singa Wang
    Pai, Fan-Yun
    Wu, Wen Kuei
    [J]. ECONOMIC MODELLING, 2013, 35 : 593 - 596
  • [2] Multi-Item EPQ Model with Scrap, Rework and Multi-Delivery using Common Cycle Policy
    Chiu, S. W.
    Tseng, C-T.
    Wu, M-F.
    Sung, P-C.
    [J]. JOURNAL OF APPLIED RESEARCH AND TECHNOLOGY, 2014, 12 (03) : 615 - 622
  • [3] Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system
    Chiu, Singa Wang
    Wu, Cheng-Sian
    Tseng, Chao-Tang
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [4] Time delay in a multi-item production-inventory system
    Zhang, RQ
    [J]. PROCEEDINGS OF THE 1996 MSOM CONFERENCE, 1996, : 329 - 334
  • [5] OPTIMAL POLICY SURFACES FOR A MULTI-ITEM INVENTORY PROBLEM
    SCHNEIDER, H
    RINKS, DB
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 39 (02) : 180 - 191
  • [6] Effect of Energy and Failure Rate in a Multi-Item Smart Production System
    Sarkar, Mitali
    Sarkar, Biswajit
    Iqbal, Muhammad Waqas
    [J]. ENERGIES, 2018, 11 (11)
  • [7] Rotation cycle schedulings for multi-item production systems
    Chan, GH
    Song, YY
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 135 (02) : 361 - 372
  • [8] GROUPING MULTI-ITEM INVENTORY USING COMMON CYCLE PERIODS
    AGGARWAL, V
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1984, 17 (03) : 369 - 372
  • [9] Study on Multi-item Process Production System Considering Setup Time
    Yamazaki, Manabu
    Ishigaki, Aya
    Kakehi, Munenori
    [J]. 2017 6TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS (IIAI-AAI), 2017, : 941 - 946
  • [10] An optimal operating policy for the production system with rework
    Liu, Ning
    Kim, Youngjoo
    Hwang, Hark
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) : 874 - 887