Multi-station test scheduling optimization method for industrial robot servo system

被引:9
|
作者
Tang, Shaomin [1 ]
Liu, Guixiong [1 ]
Lin, Zhiyu [1 ]
Li, Xiaobing [2 ]
机构
[1] South China Univ Technol, Sch Mech & Automot Engn, Guangzhou 510640, Peoples R China
[2] CEPREI, Guangzhou 510610, Peoples R China
关键词
Industrial robot; Servo system; Performance testing; Scheduling model; Scheduling optimization; KNAPSACK-PROBLEM; ALGORITHM;
D O I
10.1007/s12652-020-02577-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This study examined the test scheduling optimization problem of industrial robot servo system (IRSS) samples with unequal numbers of different types of test items on the multiple IRSS comprehensive test platforms with the same function. In order to improve IRSS performance test efficiency, a multi-station test scheduling optimization method, which combines IRSS sample-level scheduling and test item-level scheduling, was proposed. First, the IRSS sample-level scheduling was carried out, and a model was established with reference to the identical parallel machine problem (IPMP). The optimal result of IRSS sample-level multi-station scheduling was obtained by solving the model. Second, based on the result of IRSS sample-level multi-station scheduling, and taking the ideal optimal test completion time of IRSS multi-station scheduling as the target, the test items at the stations were reallocated to obtain the optimal scheduling result. Finally, an application example was used to verify the efficiency of the proposed method, and the experiment result showed that the proposed method can effectively fulfill the optimal allocation of different IRSS test items of multiple IRSS samples on multiple IRSS comprehensive test platforms. The test time was 247 min shorter than the conventional sequential parallel test and only one min longer than the ideal optimal test completion time.
引用
收藏
页码:1321 / 1337
页数:17
相关论文
共 50 条
  • [1] Multi-station test scheduling optimization method for industrial robot servo system
    Shaomin Tang
    Guixiong Liu
    Zhiyu Lin
    Xiaobing Li
    [J]. Journal of Ambient Intelligence and Humanized Computing, 2022, 13 : 1321 - 1337
  • [2] Multi-Station Multi-Robot Welding System Planning and Scheduling Based on STNSGA-D: An Industrial Case Study
    Wang, Ye
    Wang, Xuewu
    Chen, Sanyan
    Gu, Xingsheng
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, : 1 - 15
  • [3] Multi-Station Multi-Robot Welding System Planning and Scheduling Based on STNSGA-D: An Industrial Case Study
    Wang, Ye
    Wang, Xuewu
    Chen, Sanyan
    Gu, Xingsheng
    [J]. IEEE Transactions on Automation Science and Engineering, 2023, : 1 - 15
  • [4] A Test Procedure Optimization Method for an Industrial Robot Servo System on an Integrated Testing Platform
    Tang, Shaomin
    Liu, Guixiong
    Lin, Zhiyu
    Li, Xiaobing
    Pan, Minqiang
    [J]. COMPLEXITY, 2020, 2020
  • [5] A resilient scheduling framework for multi-robot multi-station welding flow shop scheduling against robot failures
    Wang, Ming
    Zhang, Peng
    Zhang, Guoqing
    Sun, Kexin
    Zhang, Jie
    Jin, Mengyu
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2025, 91
  • [6] Multi-Robot Multi-Station Cooperative Spot Welding Task Allocation Based on Stepwise Optimization: An Industrial Case Study
    Zhou, Bo
    Zhou, Rui
    Gan, Yahui
    Fang, Fang
    Mao, Yujie
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2022, 73
  • [7] Multi-station Job Shop Scheduling with Operations Overlapping
    Chai, Yongsheng
    Zhou, Yulan
    Wang, Yantao
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS 1-5, 2008, : 1753 - 1756
  • [8] Stroke optimization of a novel multi-station rotary polishing robot based on workspace analysis
    李东京
    Wei Wang
    Wang Qilong
    Hao Daxian
    Jin Hui
    [J]. High Technology Letters, 2018, 24 (03) : 313 - 321
  • [9] MULTI-STATION GRAVITY DELIVERY SYSTEM
    LAPIDUS, BM
    MACINDOE, RC
    [J]. AMERICAN JOURNAL OF CLINICAL PATHOLOGY, 1978, 69 (01) : 73 - 76
  • [10] Multi-station system improves flexibility
    Smock, D
    [J]. PLASTICS WORLD, 1996, 54 (09): : 18 - 18