共 50 条
- [2] Weibull-distribution-based Method of Bayesian Reliability Evaluation for Machining Center [J]. EQUIPMENT MANUFACTURING TECHNOLOGY AND AUTOMATION, PTS 1-3, 2011, 317-319 : 1949 - 1953
- [3] Reliability Evaluation on Machining Center Based on Three-Parameter Weibull Distribution [J]. FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3, 2012, 430-432 : 1645 - +
- [4] Study on Reliability Test Methods of Machining Center [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 829 - 833
- [5] Study on Simulation Reliability Test of Machining Center [J]. MECHANICAL ENGINEERING AND GREEN MANUFACTURING, PTS 1 AND 2, 2010, : 360 - 364
- [6] RELIABILITY ANALYSIS OF MACHINING CENTER BASED ON THE FIELD DATA [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2013, 15 (02): : 147 - 155
- [7] Three-parameter Weibull distribution of machining center based on ITLS and DE [J]. Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2015, 43 (06): : 84 - 88
- [8] Reliability Modeling of Complex Electronic System Based on Weibull Distribution [J]. PROCEEDINGS OF THE 2018 3RD INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION AND APPLIED MATHEMATICS (MSAM 2018), 2018, 160 : 1 - 4
- [9] Study on Real-Time Reliability Evaluation and Prediction of Machining Center Based on Expert Modeler [J]. PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 1747 - 1752
- [10] Measures for Improving Reliability of the Machining Center [J]. MECHANICAL ENGINEERING AND GREEN MANUFACTURING, PTS 1 AND 2, 2010, : 527 - 532