A Risk Assessment Model of Flood Based on Information Diffusion Method and BP Neural Network

被引:0
|
作者
Chen, Junfei [1 ,2 ]
Jin, Qiongji [1 ]
Wang, Huimin [1 ,2 ]
Zhao, Shufang [1 ]
机构
[1] Hohai Univ, Sch Business, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210098, Jiangsu, Peoples R China
来源
PRZEGLAD ELEKTROTECHNICZNY | 2012年 / 88卷 / 9B期
关键词
Information diffusion; Back propagation (BP) neural network; Flood disaster; Risk Assessment; DISASTER;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Climate change has caused more frequent floods in China which have already resulted in huge losses. Thus flood risk assessment and management is an important research topic. In this paper, a new model of flood risk assessment is proposed based on the information diffusion theory and the back propagation (BP) neural network. Due to the fact that flood statistics data are relatively short and often insufficient for flood risk assessment, the information diffusion method can transform imperfect flood historical data from a point in a traditional data sample to a fuzzy data set and obtain optimized data sample. Then, the optimized data are used to train neural networks with back propagation and can improve neural network adaptive ability. The flood data of Dongting Lake's different encirclement dikes are used to assess the flood risk of Dongting Lake with the proposed model in this research. The results are consistent with the actual situation of Dongting Lake area, which thus verifies the model's effectiveness for flood risk management. This method can be easily applied to effectively resolve problems of insufficient samples in flood risk assessment.
引用
收藏
页码:33 / 36
页数:4
相关论文
共 50 条
  • [1] Flood Risk Assessment Based on the Information Diffusion Method
    Qiong, Li
    ADVANCES IN COMPUTER SCIENCE, ENVIRONMENT, ECOINFORMATICS, AND EDUCATION, PT I, 2011, 214 : 111 - 117
  • [2] Analysis and modelling of flood risk assessment using information diffusion and artificial neural network
    Li, Qiong
    Jiang, Xingwen
    Liu, Donghan
    WATER SA, 2013, 39 (05) : 643 - 648
  • [3] MAJOR PROJECT RISK ASSESSMENT METHOD BASED ON BP NEURAL NETWORK
    Liu, Lidong
    Wei, Fajie
    Zhou, Shenghan
    DISCRETE AND CONTINUOUS DYNAMICAL SYSTEMS-SERIES S, 2019, 12 (4-5): : 1053 - 1064
  • [4] Research on cardiovascular risk assessment model based on BP neural network
    Sun, Z. W.
    Li, J.
    Yang, J. J.
    Zhang, B.
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2018, 123 : 17 - 17
  • [5] The Model of Project Risk Assessment Based on BP Neural Network Algorithm
    Bai, Lei
    Li, Fuling
    2013 3RD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2013, : 326 - 329
  • [6] AGRICULTURE FLOOD RISK ASSESSMENT BASED ON INFORMATION DIFFUSION
    Sun, Zhangli
    Liu, Xianfeng
    Zhu, Xiufang
    Pan, Yaozhong
    2016 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2016, : 4391 - 4394
  • [7] Flight Operation Risk Assessment Method Based on BP Neural Network Algorithm
    Yu Liling
    Xiao Xianbo
    Wang Haofeng
    Li Bin
    Xu Xiangsong
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 200 - 206
  • [8] A New Model of Enterprise Credit Risk Assessment Based on BP Neural Network
    Guo Yang
    Dong Huailin
    Zheng Yuhui
    Wu Junjie
    Wu Jing
    ICCSE 2008: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION: ADVANCED COMPUTER TECHNOLOGY, NEW EDUCATION, 2008, : 410 - 414
  • [9] A Method of Risk Assessment of Information Security Based on Artificial Neural Network
    Zhao, D. M.
    Liu, J. X.
    Zu, J. X.
    ITESS: 2008 PROCEEDINGS OF INFORMATION TECHNOLOGY AND ENVIRONMENTAL SYSTEM SCIENCES, PT 1, 2008, : 246 - 252
  • [10] Flood Disaster Evaluation Based on Improved BP Neural Network Model
    Yang, Xiaoling
    Zhou, Jianzhong
    Ding, Jiehua
    Zhang, Yongchuan
    ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 2462 - 2465