Repair of post-tensioned precast beam to column connections

被引:0
|
作者
Kaya, Mustafa [1 ]
Arslan, A. Samet [2 ]
机构
[1] Aksaray Univ, Dept Civil Engn, Fac Engn, TR-68100 Aksaray, Turkey
[2] Gazi Univ, Fac Engn, Ankara, Turkey
来源
关键词
D O I
10.1002/tal.652
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Earthquakes can cause immense damage to precast structures, rendering them inhabitable. After the 1999 Marmara earthquake in Turkey, research by the Turkish Precast Union stated that 24.50% of the precast structures were damaged with some of this damage being observed in the beam-to-column connections of the structures. Since it is essential to provide those rendered homeless by the earthquake with safe habitable accommodation, repairing medium and slight levels of damage at the connection parts should be undertaken. In order to prove that a repaired connection was sufficiently strong, a precast beam-to-column post-tensioned connection was tested in three phases. In phase one, middle level damage was observed at 6% drift at these connections. In phase two, 1.2, 2.4 and 4.8% drifts were applied three times to the test specimens. As a result of the extra loads applied, little damage was observed. In the last phase, the four connections tested in the first phase were repaired using epoxy resin and then retested. The results from the tests on the repaired precast and the reference undamaged specimens showed that the repaired specimens were sufficiently strong, thus proving that repair to damaged precast beam-to-column post-tensioned connections can be undertaken. Copyright (c) 2010 John Wiley & Sons, Ltd.
引用
收藏
页码:844 / 854
页数:11
相关论文
共 50 条
  • [1] Analytical modeling of post-tensioned precast beam-to-column connections
    Kaya, Mustafa
    Arslan, A. Samet
    [J]. MATERIALS & DESIGN, 2009, 30 (09) : 3802 - 3811
  • [2] Seismic behaviour of post-tensioned precast concrete beam-column connections
    Hwang, Jin-Ha
    Choi, Seung-Ho
    Lee, Deuck Hang
    Kim, Kang Su
    Kwon, Oh-Sung
    [J]. MAGAZINE OF CONCRETE RESEARCH, 2021, 73 (09) : 433 - 447
  • [3] Seismic behavior of post-tensioned precast reinforced concrete beam-to-column connections
    Cheng, Chin-Tung
    [J]. COMPUTERS AND CONCRETE, 2008, 5 (06): : 525 - 544
  • [4] Moment rotation behavior of unbonded post-tensioned precast concrete beam-column connections
    El-Sheikh, M
    Pessiki, S
    Sause, R
    Lu, LW
    [J]. ACI STRUCTURAL JOURNAL, 2000, 97 (01) : 122 - 131
  • [5] Post-tensioned interior precast wide beam-column connections subjected to lateral loading
    Moon, J. H.
    Choi, Y. C.
    Lim, J. H.
    Lee, L. H.
    Kwon, K. H.
    Kim, K. S.
    [J]. ADVANCES IN STRUCTURAL ENGINEERING, 2007, 10 (05) : 487 - 500
  • [6] Experimental study on seismic behavior of local post-tensioned precast concrete beam-to-column connections
    Yang, Hui
    Guo, Zhengxing
    Xu, Aoyi
    Guan, Dongzhi
    Feng, Jiansen
    [J]. Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2019, 49 (06): : 1101 - 1108
  • [7] Effect of post-tensioned spandrel beam on wide beam-column connections
    Behnam, Hamdolah
    Kuang, J. S.
    Abdouka, Kamiran
    [J]. MAGAZINE OF CONCRETE RESEARCH, 2018, 70 (01) : 28 - 41
  • [8] Numerical analysis for seismic behavior of self-centering post-tensioned precast beam-to-column connections
    Cai, Xiao-Ning
    Meng, Shao-Ping
    [J]. Gongcheng Lixue/Engineering Mechanics, 2016, 33 (03): : 143 - 151
  • [9] Experimental and numerical investigations on novel post-tensioned precast beam-to-column energy-dissipating connections
    Wang, Shuguang
    Zhang, Tianyang
    Xu, Weizhi
    Du, Dongsheng
    Zhang, Yunlong
    [J]. STRUCTURES, 2023, 54 : 117 - 133
  • [10] Experimental investigations of the H-shaped post-tensioned precast frame module with monolithic beam-column connections
    Hong, Won-Kee
    Pham, Tien Dat
    Nguyen, Dinh Han
    Le, Thuc Anh
    Nguyen, Manh Cuong
    Nguyen, Van Tien
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,