Scheduling of a job-shop problem with limited output buffers

被引:5
|
作者
Zeng, Chengkuan [1 ]
Tang, Jiafu [2 ]
Fan, Zhi-Ping [1 ]
Yan, Chongjun [2 ]
机构
[1] Northeastern Univ, Sch Business Adm, Dept Informat Management & Decis Sci, Shenyang, Liaoning, Peoples R China
[2] DUFE, Coll Management Sci & Engn, Dalian, Peoples R China
关键词
Job-shop scheduling; limited output buffer; disjunctive graph model; uniform distribution; GENETIC ALGORITHM; CONSTRAINTS; BLOCKING; MACHINE; SEARCH;
D O I
10.1080/0305215X.2019.1577407
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article addresses a job-shop problem with limited output buffers (JS-LOB) with the objective of minimizing the process makespan. An integer nonlinear mathematical programming model is proposed to describe this problem. Based on the model, a two-stage algorithm consisting of obtaining feasible solutions and a local search is proposed to solve the JS-LOB problem. The local search has two operators: the first is a neighbourhood structure based on a disjunctive graph model, and the second is similar to crossover in the genetic algorithm to avoid falling into local optima. Computational results are presented for a set of benchmark tests. The results show the effectiveness of the proposed algorithm and indicate whether the processing time of the job conforms to a uniform distribution. When the proportion between the capacity of the buffer and the number of jobs is larger than 20%, the influence of the buffer becomes very small.
引用
收藏
页码:53 / 73
页数:21
相关论文
共 50 条
  • [1] Job-shop scheduling with limited buffers
    Liljenvall, T
    [J]. ALGORITHMS AND ARCHITECTURES FOR REAL-TIME CONTROL 1997, 1997, : 301 - 302
  • [2] Job-shop scheduling with limited capacity buffers
    Peter Brucker
    Silvia Heitmann
    Johann Hurink
    Tim Nieberg
    [J]. OR Spectrum, 2006, 28 : 151 - 176
  • [3] Job-shop scheduling with limited capacity buffers
    Brucker, P
    Heitmann, S
    Hurink, J
    Nieberg, T
    [J]. OR SPECTRUM, 2006, 28 (02) : 151 - 176
  • [4] ON THE JOB-SHOP SCHEDULING PROBLEM
    MANNE, AS
    [J]. OPERATIONS RESEARCH, 1960, 8 (02) : 219 - 223
  • [5] A GRASP algorithm for flexible job-shop scheduling problem with limited resource constraints
    Rajkumar, M.
    Asokan, P.
    Anilkumar, N.
    Page, T.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (08) : 2409 - 2423
  • [6] A BROADER VIEW OF THE JOB-SHOP SCHEDULING PROBLEM
    WEIN, LM
    CHEVALIER, PB
    [J]. MANAGEMENT SCIENCE, 1992, 38 (07) : 1018 - 1033
  • [7] Genetic algorithms for a job-shop scheduling problem
    Nakagami, M
    Ishida, M
    [J]. KAGAKU KOGAKU RONBUNSHU, 1997, 23 (02) : 175 - 180
  • [8] Hybird algorithm for job-shop scheduling problem
    Chen, X
    Kong, QS
    Wu, QD
    [J]. PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1739 - 1743
  • [9] Job-shop scheduling problem with energy consideration
    Masmoudi, Oussama
    Delorme, Xavier
    Gianessi, Paolo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 216 : 12 - 22
  • [10] AN IMPROVED FORMULATION FOR THE JOB-SHOP SCHEDULING PROBLEM
    LIAO, CJ
    YOU, CT
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (11) : 1047 - 1054