Integrated treatment of combined sewer wastewater and stormwater in a hybrid constructed wetland system in southern Spain and its further reuse

被引:71
|
作者
Avila, Cristina [1 ]
Jose Salas, Juan [2 ]
Martin, Isabel [2 ]
Aragon, Carlos [2 ]
Garcia, Joan [1 ]
机构
[1] Univ Politecn Catalunya BarcelonaTech, Dept Hydraul Maritime & Environm Engn, GEMMA Grp Environm Engn & Microbiol, E-08034 Barcelona, Spain
[2] Fdn Ctr New Water Technol CENTA, Seville 41820, Spain
来源
ECOLOGICAL ENGINEERING | 2013年 / 50卷
关键词
Combined sewer; Constructed wetlands; First-flush; Reed beds; Stormwater; Treatment wetlands; Urban wastewater; Water reuse; HORIZONTAL SUBSURFACE FLOW; 1ST FLUSH; REMOVAL; OVERFLOWS;
D O I
10.1016/j.ecoleng.2012.08.009
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
An integrated pilot-scale treatment system consisting of a vertical subsurface flow (317 m(2)), a horizontal subsurface flow (229 m(2)) and a free water surface (240 m(2)) constructed wetlands operating in series for the treatment of a combined sewer effluent was put into operation and monitored over a period of about 1.5 years. The goal of the treatment system was to provide effluents suitable for various water reuse applications. Moreover, the influence of pulses of high flow resulting from several rain events over the treatment performance of the system was evaluated. An intensive sampling campaign was also carried out following an intense storm (45 mm in one-hour span) to have a further insight into the characteristics of the inflowing water at the early part of it or so-called 'first-flush'. Results under dry weather conditions showed a good performance on the removal of BOD5, COD and TSS taking place already in the vertical flow wetland (94,85 and 90%, respectively). A high removal of total nitrogen occurred also in the vertical flow wetland (66%) suggesting both nitrification and denitrification to take place, presumably due to the existence of both aerobic and anoxic microenvironments within the bed. Removal of Escherichia coli along the treatment system was of almost 5 log units. To this respect, the horizontal flow and free water surface wetlands proved to be crucial treatment units to achieve a water quality suitable for further reuse (e.g. recharge of aquifers by percolation through the ground, silviculture and irrigation of green areas non accessible to the public). Although the occurrence of the storm event caused a prompt raise of COD and TSS within the first 30 min of rainfall (868 and 764 mg L-1, respectively), it was soon followed by a dilution effect. In general the storm events did not jeopardize the correct functioning of the system, proving its robustness for the treatment of a combined sewer effluent. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:13 / 20
页数:8
相关论文
共 48 条
  • [1] Design of a Combined Constructed Wetland System and Its Application on Swine Wastewater Treatment
    Hu, Zhiqiang
    Chu, Yin
    Ma, Youhua
    [J]. JOURNAL OF ENVIRONMENTAL ENGINEERING, 2020, 146 (01)
  • [2] Treatment of Winery Wastewater with a Multistage Constructed Wetland System for Irrigation Reuse
    Milani, Mirco
    Consoli, Simona
    Marzo, Alessia
    Pino, Alessandra
    Randazzo, Cinzia
    Barbagallo, Salvatore
    Cirelli, Giuseppe Luigi
    [J]. WATER, 2020, 12 (05)
  • [3] WASTEWATER TREATMENT SYSTEM IN ALBANIA USING CONSTRUCTED WETLAND AND REUSE TECHNOLOGIES
    Gjinali, E.
    Malollari, I.
    Kopali, A.
    [J]. JOURNAL OF ENVIRONMENTAL PROTECTION AND ECOLOGY, 2011, 12 (02): : 667 - 677
  • [4] Effects of integrated stormwater management strategies on the combined sewer system and the wastewater treatment plant-river system
    Welker, A
    Leinweber, U
    Klepiszewski, K
    Schmitt, TG
    [J]. WATER SCIENCE AND TECHNOLOGY, 1999, 39 (02) : 151 - 157
  • [5] Sustainable wastewater treatment using a new combined hybrid digester - Constructed wetland system
    Sanchez, M.
    Ruiz, I.
    Soto, M.
    [J]. JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2023, 11 (05):
  • [6] Three-stage hybrid constructed wetland system for wastewater treatment and reuse in warm climate regions
    Avila, Cristina
    Garfi, Marianna
    Garcia, Joan
    [J]. ECOLOGICAL ENGINEERING, 2013, 61 : 43 - 49
  • [7] A combined system of lagoon and constructed wetland for an effective wastewater treatment
    Steinmann, CR
    Weinhart, S
    Melzer, A
    [J]. WATER RESEARCH, 2003, 37 (09) : 2035 - 2042
  • [8] Emerging organic contaminant removal in a full-scale hybrid constructed wetland system for wastewater treatment and reuse
    Avila, Cristina
    Bayona, Josep M.
    Martin, Isabel
    Jose Salas, Juan
    Garcia, Joan
    [J]. ECOLOGICAL ENGINEERING, 2015, 80 : 108 - 116
  • [9] Efficiency of the Installation to Treatment of Outflow from the Hybrid Constructed Wetland System and Possibility of Reuse of Treated Wastewater in the Household
    Myka-Raduj, Anna
    Siwiec, Tadeusz
    Rybczynska-Tkaczyk, Kamila
    Raduj, Waldemar
    Jozwiakowski, Krzysztof
    [J]. ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2024, 18 (04) : 296 - 311
  • [10] Algae-constructed wetland integrated system for wastewater treatment: A review
    Truong, Hai Bang
    Nguyen, T. Hong Tinh
    Tran, Quoc Ba
    Lam, Vinh Son
    Nguyen, Nguyen
    Nguyen, Xuan Cuong
    [J]. BIORESOURCE TECHNOLOGY, 2024, 406