Influence of rub-plate length on forces and displacements of longitudinally coupled slab track for a bridge turnout

被引:10
|
作者
Wang, P. [1 ]
Ren, J. J. [1 ]
Xiang, R.
Liu, X. Y. [1 ]
机构
[1] SW Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Peoples R China
基金
中国国家自然科学基金;
关键词
rub-plate length; jointless turnout; longitudinally coupled prefabricated slab track; slab track;
D O I
10.1177/0954409711420776
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Because of the successful construction and operation of the Beijing-Tianjin intercity railway line, the longitudinally coupled prefabricated slab track (LCPBT) system has shown its outstanding advantages in both mechanical and structural aspects. With a design speed of 350 km/h, the LCPBT system was also used on the 595.62-m-long, double-track LeiDa Bridge on the Wuhan-Guangzhou passenger dedicated line (PDL) in China. To equably transfer longitudinal force from the coupled concrete base to the subbase by friction, a reinforced concrete rub-plate was placed in transition zones from bridges to the subgrade. A 100-m-long, 0.4-m-thick rub-plate was built at the Beijing-Tianjin intercity railway line, whereas a 50-m-long rub-plate was used at the Wuhan-Guangzhou PDL. This article established an integral finite element model of jointless turnout (crossover)-track slab-bridge-pier taking the LCPBT system on LeiDa Bridge as an example, and researched the proper setting length of the rub-plate in this structure. Calculation conclusions and suggestions were given: the 100-m-long rub-plate used on the Beijing-Tianjin intercity railway line can be shortened; a length of 50-75m will be appropriate as the case may be; in specific circumstances, it can be designed within the range 25-50 m.
引用
收藏
页码:284 / 293
页数:10
相关论文
共 5 条
  • [1] Influence of void underneath slab on mechanical behavior of longitudinally coupled slab ballastless track turnout on bridge
    Liu, Yang
    Ren, Juanjuan
    Wu, Yaping
    Liu, Xueyi
    Zhongguo Tiedao Kexue/China Railway Science, 2014, 35 (06): : 21 - 27
  • [2] Force Characteristics of Longitudinally Coupled Slab Track Turnout on Bridges Under Temperature Action
    Ren, Juan Juan
    Xiang, Rui
    Liu, Xueyi
    TRANSPORTATION RESEARCH RECORD, 2010, (2159) : 85 - 90
  • [3] Influence analysis of longitudinally coupled prefabricated slab track on driving safety and reliability
    Gao F.
    Cheng X.
    Journal of Railway Science and Engineering, 2023, 20 (01) : 136 - 144
  • [4] Influence Analysis of Cell Plate Length to Slab Track Vertical Dynamic Response
    Ma, Xiaochuan
    Luo, Wei
    Wang, Ping
    Guo, Baoru
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 58 - 63
  • [5] Influence of slab length on dynamic characteristics of subway train-steel spring floating slab track-tunnel coupled system
    Xu, Qing-Yuan
    Yan, Bin
    Lou, Ping
    Zhou, Xiao-lin
    LATIN AMERICAN JOURNAL OF SOLIDS AND STRUCTURES, 2015, 12 (04): : 649 - 674