共 50 条
- [2] The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time [J]. The International Journal of Advanced Manufacturing Technology, 2008, 37 : 166 - 177
- [3] The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (1-2): : 166 - 177
- [5] THE TWO-STAGE ASSEMBLY FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2029 - 2035
- [6] Two-Stage Assembly Flowshop Scheduling Problem with Distinct Due Windows [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 659 - 663
- [7] Bicriteria in a two-stage flowshop scheduling problem [J]. INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
- [10] Scheduling the distributed assembly flowshop problem to minimize the makespan [J]. CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, 2019, 164 : 471 - 477