Medium-term Rail Planning at Rio Tinto Iron Ore

被引:0
|
作者
Garcia-Flores, R. [1 ]
Singh, G. [1 ]
Ernst, A. [1 ]
Welgama, P. [2 ]
机构
[1] CSIRO Math Informat & Stat, Private Bag 33, Clayton, Vic 3169, Australia
[2] Rio Tinto Tech Serv, Perth, WA 6837, Australia
关键词
Scheduling; Rail planning; Medium-term planning; Blending; Mixed-integer non-linear programming; OPERATIONS; MODEL;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In minerals supply chains, medium term plans over time horizons from two weeks to two years are used not only to maximise throughput and identify bottlenecks, but also for scheduling crews, production and maintenance. These plans need to observe constraints like maintenance and production requirements, fleet capacities, and dumping, loading and stockyard management at every site. Additionally, the iron ore supply chains considered in this paper also needs to deal with grade quality constraints. This introduces extra complexities in terms of non-linear constraints as the quality depends on the mixing ratio of ore from different sources. We present an optimisation tool that was developed for Rio Tinto Iron Ore for such planning. The tool provides optimal number of trains while taking into account all the system constraints and has already reduced total planning time significantly.
引用
收藏
页码:311 / 317
页数:7
相关论文
共 50 条
  • [1] Medium-Term Rail Scheduling for an Iron Ore Mining Company
    Singh, Gaurav
    Garcia-Flores, Rodolfo
    Ernst, Andreas
    Welgama, Palitha
    Zhang, Meimei
    Munday, Kerry
    [J]. INTERFACES, 2014, 44 (02) : 222 - 240
  • [2] Rio Tinto continues iron ore port expansions
    不详
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2007, 208 (02): : 4 - 4
  • [3] Rio Tinto and Chinalco to Develop Guinea Iron Ore Project
    不详
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2010, 211 (03): : 16 - 16
  • [4] Rio Tinto Adds Two More Iron Ore Projects
    不详
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2011, 212 (02): : 6 - 6
  • [5] Australia/Oceania Rio Tinto Iron ore supply contract
    不详
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2004, 205 (05): : 15 - +
  • [6] Origin of the Rio Tinto ore bodies
    Douglas, GV
    [J]. NATURE, 1927, 120 : 547 - 548
  • [7] Model for medium-term operations planning in an intermodal rail-truck service
    Nozick, LK
    Morlok, EK
    [J]. TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1997, 31 (02) : 91 - 107
  • [8] MEDIUM-TERM PLANNING IN NETHERLANDS
    PONSEN, KW
    [J]. PLANNING AND DEVELOPMENT IN THE NETHERLANDS, 1970, 4 (02): : 140 - 154
  • [9] Medium-term silvicultural planning
    VonGadow, K
    [J]. FORSTWISSENSCHAFTLICHES CENTRALBLATT, 1996, 115 (02): : 90 - 96
  • [10] Rio Tinto Adds $4.2B to its Iron Ore Spending
    不详
    [J]. E&MJ-ENGINEERING AND MINING JOURNAL, 2012, 213 (07): : 5 - 5