共 50 条
- [1] Asset management: Quantifying economic lifetime of large-diameter pipelines [J]. JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2008, 100 (07): : 110 - +
- [4] Risk-Based Asset Management Optimization [J]. 2014 IEEE PES T&D CONFERENCE AND EXPOSITION, 2014,
- [5] Risk-based planner for asset management [J]. IEEE COMPUTER APPLICATIONS IN POWER, 2001, 14 (04): : 20 - 26
- [7] INTERNAL JOINT SEALING OF LARGE-DIAMETER PIPELINES [J]. JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1987, 79 (07): : 53 - 53
- [8] The interface challenge in risk-based Asset Management [J]. LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 1578 - 1585
- [9] Liquid holdup in large-diameter horizontal multiphase pipelines [J]. JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1998, 120 (03): : 185 - 191
- [10] Risk-Based Integration of Strategic and Tactical Capacity Planning [J]. Annals of Operations Research, 2004, 132 : 85 - 108