An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time

被引:93
|
作者
Jiang, En-da [1 ]
Wang, Ling [1 ]
机构
[1] Tsinghua Univ, Dept Automat, Tsinghua Natl Lab Informat Sci & Technol TNList, Beijing 100084, Peoples R China
关键词
energy-efficient scheduling; sequence-dependent setup time; multi-objective evolutionary algorithm; decomposition; dynamic mating strategy; local intensification; OPTIMIZATION; MACHINE; MOEA/D;
D O I
10.1080/00207543.2018.1504251
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the increasing attention on environment issues, green scheduling in manufacturing industry has been a hot research topic. As a typical scheduling problem, permutation flow shop scheduling has gained deep research, but the practical case that considers both setup and transportation times still has rare research. This paper addresses the energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time to minimise both makespan as economic objective and energy consumption as green objective. The mathematical model of the problem is formulated. To solve such a bi-objective problem effectively, an improved multi-objective evolutionary algorithm based on decomposition is proposed. With decomposition strategy, the problem is decomposed into several sub-problems. In each generation, a dynamic strategy is designed to mate the solutions corresponding to the sub-problems. After analysing the properties of the problem, two heuristics to generate new solutions with smaller total setup times are proposed for designing local intensification to improve exploitation ability. Computational tests are carried out by using the instances both from a real-world manufacturing enterprise and generated randomly with larger sizes. The comparisons show that dynamic mating strategy and local intensification are effective in improving performances and the proposed algorithm is more effective than the existing algorithms.
引用
收藏
页码:1756 / 1771
页数:16
相关论文
共 50 条
  • [1] A Multi-Objective Whale Swarm Algorithm for Energy-Efficient Distributed Permutation Flow shop Scheduling Problem with Sequence Dependent Setup Times
    Wang, Guangchen
    Li, Xinyu
    Gao, Liang
    Li, Peigen
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 235 - 240
  • [2] Multi-objective distributed reentrant permutation flow shop scheduling with sequence-dependent setup time
    Rifai, Achmad Pratama
    Mara, Setyo Tri Windras
    Sudiarso, Andi
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 183
  • [3] An energy-efficient multi-objective permutation flow shop scheduling problem using an improved hybrid cuckoo search algorithm
    Gu, Wenbin
    Li, Zhuo
    Dai, Min
    Yuan, Minghai
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2021, 13 (06)
  • [4] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    V. Anjana
    R. Sridharan
    P. N. Ram Kumar
    [J]. Journal of Scheduling, 2020, 23 : 49 - 69
  • [5] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    Anjana, V.
    Sridharan, R.
    Kumar, P. N.
    [J]. JOURNAL OF SCHEDULING, 2020, 23 (01) : 49 - 69
  • [6] Discrete evolutionary multi-objective optimization for energy-efficient blocking flow shop scheduling with setup time
    Han, Yuyan
    Li, Junqing
    Sang, Hongyan
    Liu, Yiping
    Gao, Kaizhou
    Pan, Quanke
    [J]. APPLIED SOFT COMPUTING, 2020, 93
  • [7] A hybrid multi-objective evolutionary algorithm based on decomposition for green permutation flow-shop scheduling problem
    Luo, Cong
    Gong, Wen-Yin
    [J]. Kongzhi yu Juece/Control and Decision, 2024, 39 (08): : 2737 - 2745
  • [8] Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm
    Lu, Chao
    Gao, Liang
    Li, Xinyu
    Pan, Quanke
    Wang, Qi
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 144 : 228 - 238
  • [9] Energy-efficient distributed permutation flow shop scheduling problem using a multi-objective whale swarm algorithm
    Wang, Guangchen
    Gao, Liang
    Li, Xinyu
    Li, Peigen
    Tasgetiren, M. Fatih
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2020, 57
  • [10] Adaptive Hybrid Algorithms for the Sequence-Dependent Setup Time Permutation Flow Shop Scheduling Problem
    Li, Xiaoping
    Zhang, Yi
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (03) : 578 - 595