ESTIMATING NORMAL DURATION OF RENOVATION FOR MULTISTORY APARTMENT BUILDING CONSIDERING EXTENSION-TYPE RENOVATION PROJECTS

被引:10
|
作者
Yoon, Jongsik [1 ]
Yu, Ilhan [2 ]
机构
[1] Ajou Univ, Dept Architectural Engn, Suwon, South Korea
[2] Korea Res Inst Construct Policy, Future Strategy Div, Seoul, South Korea
关键词
sustainable apartment renovation; building renovation; normal project duration; duration estimation; simulation model; MCS (Monte Carlo simulation); CONSTRUCTION; MODEL; COST; UNCERTAINTY; NETWORKS;
D O I
10.3846/jcem.2019.8024
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Normal (typical) project duration is estimated at the initial stage of a renovation project and is an important reference for project control. However, its estimation has not been researched extensively owing to the complexity and uncertainties of renovation. Thus, a model was developed for predicting the duration of sustainable apartment renovation. Experts were asked to estimate a baseline schedule for extension-type renovation projects, factors that influence critical path activities, and the range of project durations considering these factors. An equation for estimating the duration of a renovation project was developed, and the range of project durations was derived using a MCS to reflect uncertainty. The proposed model was validated by applying it to actual cases. The case study shows that the model would be more suitable for complex renovation construction (i.e., more than two buildings or vertical extension). The model can be applied to various renovation projects and used as a reference for determining contract time. It can fill the knowledge gap of construction duration forecasting by adapting the concept of control activities to simplify the assessment of uncertainties in renovation of apartments, and can be applied for forecasting sustainable renovation time for other project types or in other locations.
引用
收藏
页码:156 / 167
页数:12
相关论文
共 5 条
  • [1] Takt Planning in Apartment Building Renovation Projects
    Keskiniva, Kimmo
    Saari, Arto
    Junnonen, Juha-Matti
    [J]. BUILDINGS, 2020, 10 (12) : 1 - 17
  • [2] Modeling duration of building renovation projects
    Lawal, Haruna Sa'idu
    Ahmadu, Hassan Adaviriku
    Abdullahi, Muhammad
    Yamusa, Muhammad Aliyu
    Abdulrazaq, Mustapha
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2023, 28 (03) : 423 - 438
  • [3] A Final Cost Estimating Model for Building Renovation Projects
    Papadimitriou, Vasso E.
    Aretoulis, Georgios N.
    [J]. BUILDINGS, 2024, 14 (04)
  • [4] Determining Value at Risk for Estimating Renovation Building Projects by Application of Probability-based Fuzzy Set Theory
    Cha, HeeSung
    Lee, DongGun
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2018, 17 (01) : 63 - 70
  • [5] Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project's Attributes
    Cho, Kyuman
    Kim, Taehoon
    Hong, Taehoon
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (02)