In-flight Simulation of Pile Installation in Slopes in Centrifuge Model Tests

被引:6
|
作者
Wang, Liping [1 ]
Zhang, Ga [2 ]
机构
[1] Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Inst Geotech Engn, Dept Hydraul Engn, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
来源
GEOTECHNICAL TESTING JOURNAL | 2015年 / 38卷 / 01期
基金
中国国家自然科学基金;
关键词
slope; reinforced soils; pile; device; centrifuge model test; BEHAVIOR; STABILIZE;
D O I
10.1520/GTJ20130169
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A new device was developed to simulate the in-flight installation of jacked displacement piles in slopes using centrifuge model tests. In the modularization-based design of this device, the pile installation process is divided into combinations of five-axis movements, which are realized by corresponding electric motors. New structures consisting of combined cubes and cylinders are proposed for the pile top and the picking-up unit. In addition, this device utilizes a series of techniques, such as the use of linear guideways, to increase digital control and the local stiffness of key structures. These measures provide a high degree of automation with good accuracy in determining the locations and vertical extents of piles during installation. The structures and electric motors in the device were optimized to provide high capacities for the load (10 kN) and displacement (260 mm). This device was designed with hollow components to control the size and mass of the entity (only 50 kg) and to satisfy rigorous requirements regarding the allowable deformation and stability levels during centrifuge model tests. The effectiveness of the device was verified using pile installation tests under various conditions. The test results were compared with results that were obtained using pre-flight pile installation. Overall, the pile installation method influenced the responses of the pile-reinforced slopes. For example, the loading-induced displacement of the slope with piles installed in-flight was considerably greater than that in the slope with piles installed at the 1g level when the load was near the limit.
引用
收藏
页码:50 / 60
页数:11
相关论文
共 50 条
  • [1] Effects of Pile Installation Simulation on Behavior of Pile Groups in Centrifuge Model Tests
    Li, Yang
    Zhang, Ga
    Liu, Chunying
    GEOTECHNICAL TESTING JOURNAL, 2018, 41 (04): : 815 - 820
  • [2] In-Flight Simulation of the Excavation of Foundation Pit in Centrifuge Model Tests
    Zhang, Ga
    Yan, Guanchen
    GEOTECHNICAL TESTING JOURNAL, 2016, 39 (01): : 59 - 68
  • [3] Centrifuge model tests on pile-reinforced slopes subjected to drawdown
    Sujia Liu
    Fangyue Luo
    Ga Zhang
    Journal of Rock Mechanics and Geotechnical Engineering, 2020, (06) : 1290 - 1300
  • [4] Centrifuge model tests on pile-reinforced slopes subjected to drawdown
    Liu, Sujia
    Luo, Fangyue
    Zhang, Ga
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2020, 12 (06) : 1290 - 1300
  • [5] Centrifuge model tests on excavation in Shanghai clay using in-flight excavation tools
    Ma, X. F.
    Xu, J. W.
    PHYSICAL MODELLING IN GEOTECHNICS, VOL 1, 2018, : 419 - 424
  • [6] Application of in-flight robot in centrifuge modeling of laterally loaded stiff pile foundations
    Ubilla, J.
    Abdoun, T.
    Zimmie, T.
    PHYSICAL MODELLING IN GEOTECHNICS - 6TH ICPMG '06, VOL 1, 2006, : 259 - +
  • [7] In-flight Excavation of a Loess Slope in a Centrifuge Model Test
    Fan Z.
    Kulatilake P.H.S.W.
    Peng J.
    Che W.
    Li Y.
    Meng Z.
    Geotechnical and Geological Engineering, 2016, 34 (05) : 1577 - 1591
  • [8] Centrifuge model tests on excavation in Shanghai soft soil layers using in-flight excavation tools
    Ma X.
    Cao M.
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2023, 56 (08): : 131 - 139
  • [9] Centrifuge model tests on geotextile-reinforced slopes
    Viswanadham, B. V. S.
    Mahajan, R. R.
    GEOSYNTHETICS INTERNATIONAL, 2007, 14 (06) : 365 - 379
  • [10] Smear zone identification and soil properties around stone columns constructed in-flight in centrifuge model tests
    Weber, T. M.
    Ploetze, M.
    Laue, J.
    Peschke, G.
    Springman, S. M.