Incorporating Stochastic Lead Times Into the Guaranteed Service Model of Safety Stock Optimization

被引:33
|
作者
Humair, Salal [1 ,2 ]
Ruark, John D. [3 ]
Tomlin, Brian [4 ]
Willems, Sean P. [5 ]
机构
[1] Harvard Univ, Sch Publ Hlth, Boston, MA 02115 USA
[2] Lahore Univ Management Sci, Sch Sci & Engn, Dha Lahore 54792, Pakistan
[3] Logility Inc, Burlington, MA 01803 USA
[4] Dartmouth Coll, Tuck Sch Business, Hanover, NH 03755 USA
[5] Boston Univ, Sch Management, Boston, MA 02215 USA
关键词
base-stock policy; multiechelon inventory optimization; stochastic lead times; supply chain application; INVENTORY OPTIMIZATION; PLACEMENT;
D O I
10.1287/inte.2013.0699
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Effective end-to-end supply chain management and network inventory optimization must account for service levels, demand volatility, lead times, and lead-time variability. Most inventory models incorporate demand variability, but far fewer rigorously account for lead-time variability, particularly in multiechelon supply chain networks. Our research extends the guaranteed service model of safety stock placement to allow random lead times. The main methodological contribution is the creation of closed-form equations for the expected safety stock in the system; this includes a derivation for the early-arrival stock in the system. The main applied contributions are the demonstration of real stochastic lead times in practice and a discussion of how our approach outperforms more traditional heuristics that either ignore lead-time variability or consider the maximum lead time at each stage.
引用
收藏
页码:421 / 434
页数:14
相关论文
共 50 条
  • [1] A Comparison Study of Stochastic- and Guaranteed- Service Approaches on Safety Stock Optimization for Multi Serial Systems
    Li, Peng
    Wu, Di
    [J]. 2017 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION (ESMA2017), VOLS 1-4, 2018, 108
  • [2] Optimising installation (R,Q) policies in distribution networks with stochastic lead times: a comparative analysis of guaranteed- and stochastic service models
    De Smet, Niels
    Aghezzaf, El-Houssaine
    Desmet, Bram
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (13) : 4148 - 4165
  • [3] SAFETY STOCK DETERMINATION WITH CORRELATED DEMANDS AND ARBITRARY LEAD TIMES
    FOTOPOULOS, S
    WANG, MC
    RAO, SS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 35 (02) : 172 - 181
  • [4] DYNAMIC INVENTORY MODEL WITH STOCHASTIC LEAD TIMES
    KAPLAN, RS
    [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (07): : 491 - 507
  • [5] DETERMINING SAFETY STOCK IN THE PRESENCE OF STOCHASTIC LEAD TIME AND DEMAND
    EPPEN, GD
    MARTIN, RK
    [J]. MANAGEMENT SCIENCE, 1988, 34 (11) : 1380 - 1390
  • [6] Reservoir optimization model incorporating inflow forecasts with various lead times as hydrologic state variables
    Tang Guolei
    Zhou Huicheng
    Li Ningning
    [J]. JOURNAL OF HYDROINFORMATICS, 2010, 12 (03) : 292 - 302
  • [7] Stochastic optimization for transshipment problems with positive replenishment lead times
    Gong, Yeming
    Yuecesan, Enver
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (01) : 61 - 72
  • [8] Interactive Multiobjective Optimization in Lot Sizing with Safety Stock and Safety Lead Time
    Kania, Adhe
    Sipila, Juha
    Afsar, Bekir
    Miettinen, Kaisa
    [J]. COMPUTATIONAL LOGISTICS (ICCL 2021), 2021, 13004 : 208 - 221
  • [9] Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach
    Aouam, Tarik
    Ghadimi, Foad
    Vanhoucke, Mario
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2021, 131
  • [10] An integrated guaranteed- and stochastic-service approach to inventory optimization in supply chains
    Klosterhalfen, Steffen T.
    Dittmar, Daniel
    Minner, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 231 (01) : 109 - 119