The Giant Magellan Telescope (GMT) 1 is a 25 m "doubly segmented" telescope composed of seven 8.4 m "unit Gregorian telescopes", on a common mount. Each primary and secondary mirror segment will ideally lie on the geometrical surface of the corresponding rotationally symmetrical full aperture optical element. Therefore, each primary and conjugated secondary mirror segment will feed a common instrument interface, their focal planes co-aligned and co-phased. First light with a subset of four unit telescopes is currently scheduled for 2022. The project is currently considering an important aspect of the assembly, integration and verification (AIV) phase of the project. This paper will discuss a dedicated system to directly characterize the on-sky performance of the M1 segments, independently of the M2 subsystem. A Primary Mirror Metrology System (PMS) is proposed. The main purpose of this system will be to he4lp determine the rotation axis of an instrument rotator (the Gregorian Instrument Rotator or GIR in this case) and then to characterize the deflections and deformations of the M1 segments with respect to this axis as a function of gravity and temperature. The metrology system will incorporate a small (180 mm diameter largest element) prime focus corrector (PFC) that simultaneously feeds a <60" square acquisition and guiding camera field, and a Shack Hartmann wavefront sensor. The PMS is seen as a significant factor in risk reduction during AIV; it allows an on-sky characterization of the primary mirror segments and cells, without the complications of other optical elements. The PMS enables a very useful alignment strategy that constrains each primary mirror segments' optical axes to follow the GIR axis to within a few arc seconds. An additional attractive feature of the incorporation of the PMS into the AIV plan, is that it allows first on-sky telescope operations to occur with a system of considerably less optical and control complexity than the final doubly segmented Gregorian telescope configuration. This paper first discusses the strategic rationale for a PMS. Next the system itself is described in some detail. Finally, some description of the various uses the PMS will be put to during AIV of the M1 segments and subsequent characterization will be described.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Phasing metrology system for the GMT
    Acton, D. Scott
    Bouchez, Antonin
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES IV, 2012, 8444
  • [2] GMT Primary Mirror Support
    Hull, Charlie
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES V, 2014, 9145
  • [3] The GMT telescope metrology system design
    Sitarski, Breann N.
    Rakich, Andrew
    Chiquito, Hugo
    Rosenthal, Wylie
    Bouchez, Antonin H.
    Schoenell, William
    Xin, Bo
    Pires, Priscila
    Nissen, Joel
    Schurter, P.
    Demers, Richard T.
    Thompson, Peter
    McLeod, Brian
    Nemati, Bijan
    Brossus, Glenn
    Walls, Brian
    Choi, Heejoo
    Gonzalez, Guillermo
    Nemati, David
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES IX, 2022, 12182
  • [4] Prototyping the GMT Telescope Metrology System on LBT
    Rakich, A.
    Schurter, P.
    Conan, R.
    Hill, J. M.
    Gardiner, M.
    Bec, M.
    Kuhn, O.
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES VII, 2018, 10700
  • [5] A 3-D metrology system for the GMT
    Rakich, A.
    Dettmann, Lee
    Leveque, S.
    Guisard, S.
    [J]. GROUND-BASED AND AIRBORNE TELESCOPES VI, 2016, 9906
  • [6] A Load Balance Optimization Approach for the GMT Primary Mirror Support Actuator System
    Romano, Rodrigo A.
    Conan, Rodolphe
    Ranka, Trupti
    [J]. 2020 IEEE CONFERENCE ON CONTROL TECHNOLOGY AND APPLICATIONS (CCTA), 2020, : 744 - 749
  • [7] Production of 8.4 m primary mirror segments for GMT
    Martin, H. M.
    Ceragioli, R.
    Gasho, V
    Jannuzi, B. T.
    Kim, D. W.
    Kingsley, J. S.
    Law, K.
    Loeff, A.
    Lutz, R. D.
    Meyen, S.
    Oh, C. J.
    Tuell, M. T.
    Weinberger, S. N.
    West, S. C.
    Whitsitt, R.
    Wortley, R.
    [J]. ADVANCES IN OPTICAL AND MECHANICAL TECHNOLOGIES FOR TELESCOPES AND INSTRUMENTATION V, 2022, 12188
  • [8] Alternate surface measurements for GMT primary mirror segments
    Burge, J. H.
    Kot, L. B.
    Martin, H. M.
    Zhao, C.
    Zobrist, T.
    [J]. OPTOMECHANICAL TECHNOLOGIES FOR ASTRONOMY, PTS 1 AND 2, 2006, 6273
  • [9] Manufacture of 8.4 m segments for the GMT primary mirror
    Martin, H. M.
    Ceragioli, R.
    Januzzi, B. T.
    Kim, D. W.
    Kingsley, J. S.
    Law, K.
    Loeff, A.
    Lutz, R. D.
    McMahon, T. J.
    Meyen, S.
    Oh, C. J.
    Tuell, M. T.
    Weinberger, S. N.
    West, S. C.
    Wortley, R.
    [J]. ADVANCES IN OPTICAL AND MECHANICAL TECHNOLOGIES FOR TELESCOPES AND INSTRUMENTATION IV, 2020, 11451
  • [10] Performance analysis tools and results for GMT primary mirror segment active support system
    Ranka, Trupti
    Ashby, Dave
    Conan, Rodolphe
    Egan, Mark
    Schwartz, Dave
    [J]. MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VIII, 2018, 10705