An estimating combination method for interval forecasting of electrical load time series

被引:19
|
作者
Ma, Xuejiao [1 ]
Dong, Yunxuan [2 ]
机构
[1] Dalian Univ Technol, Sch Econ & Management, Dalian 116024, Peoples R China
[2] Univ Macau, Dept Elect & Comp Engn, Macau, Peoples R China
基金
中国国家自然科学基金;
关键词
Interval forecasting; Machine learning method; Distribution estimation; Feature selection; Electrical load time series; ANT COLONY OPTIMIZATION; PREDICTION INTERVALS; QUANTILE REGRESSION; PROBABILISTIC LOAD; NEURAL-NETWORKS; ALGORITHM; HYBRID; PARALLEL; DEMAND;
D O I
10.1016/j.eswa.2020.113498
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Due to the failure of deterministic point forecasting to capture the uncertainty associated with the original time series, and because it can reflect the range of electrical load fluctuation, the importance of probabilistic interval forecasting has gradually increased. However, the existing theoretical system of interval forecasting is still incomplete, is a complicated process, and has relatively low accuracy. The objective of this study is to propose an interval forecasting approach based on feature selection, the optimized machine learning method, and correction of the Gaussian distribution. By applying this approach, the distribution of predictions can be established to include all the information of prediction intervals at each confidence level, making the best use of the known information. The electrical load time series of Australia are used to examine the effectiveness of the proposed approach, and compared with other models, it is proven to not only simplify the forecasting process and shorten the processing time, but also significantly improve the forecasting efficiency, flexibility, and accuracy. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Electrical Load Time Series Data Forecasting Using Interval Type-2 Fuzzy Logic System
    Thiang, Yongky Kurniawan
    [J]. PROCEEDINGS OF 2010 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY (ICCSIT 2010), VOL 5, 2010, : 527 - 531
  • [2] Electrical load time series data forecasting using Interval Type-2 Fuzzy Logic system
    Electrical Engineering Department, Petra Christian University, 121-131 Siwalankerto Surabaya, Indonesia
    [J]. Proc. - IEEE Int. Conf. Comput. Sci. Inf. Technol., ICCSIT, 1600, (527-531):
  • [3] A time series mismatch corrective method for spatial load forecasting
    Xiao, Bai
    Mu, Gang
    Li, Ping
    Yang, Youhong
    Yan, Hao
    Yang, Chenjun
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2010, 34 (16): : 50 - 54
  • [4] Interval Forecasting with Fuzzy Time Series
    Silva, Petronio C. L.
    Sadaei, Hossein Javedani
    Guimaraes, Frederico Gadelha
    [J]. PROCEEDINGS OF 2016 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2016,
  • [5] An Adaptive Control Combination Forecasting Method for Time Series Data
    Jiang, Hongyan
    Fang, Dianjun
    Zhang, Xinyan
    [J]. Fang, Dianjun (1733316@tongji.edu.cn), 1600, Hindawi Limited (2021):
  • [6] An Adaptive Control Combination Forecasting Method for Time Series Data
    Jiang, Hongyan
    Fang, Dianjun
    Zhang, Xinyan
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [7] Interval Time Series Forecasting: An Innovative Approach Transforming Interval to Single Time Series
    Varelas, George
    Tzimas, Giannis
    [J]. Expert Systems, 2025, 42 (02)
  • [8] An adaptive time-variable weight combination forecasting method for time series
    Qu Li-li
    Chen Yan
    [J]. PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 318 - 323
  • [9] Method of multivariate time series of short-term load forecasting
    Lei, Shaolan
    Sun, Caixin
    Zhou, Quan
    Deng, Qun
    Liu, Fan
    [J]. Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2005, 20 (04): : 62 - 67
  • [10] The impact of preprocessing on forecasting electrical load: an empirical evaluation of segmenting time series into subseries
    Crone, Sven F.
    Kourentzes, Nikolaos
    [J]. 2011 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2011, : 3285 - 3292