An Exact Method for the Analysis of a Two-Machine Manufacturing System with a Finite Buffer Subject to Time-Dependent Failure

被引:7
|
作者
Xia, Beixin [1 ]
Chen, Jianping [1 ]
Zhang, Zaifang [1 ]
机构
[1] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200072, Peoples R China
基金
中国国家自然科学基金;
关键词
UNRELIABLE MACHINES; PRODUCTION LINES; PERFORMANCE; MODEL;
D O I
10.1155/2015/916193
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents an efficient exact analytical method for evaluating the performance of a two-machine manufacturing system with a finite buffer. Unlike existing work, it is assumed that the buffer is prone to time-dependent failure, that is, failure that can occur even when the buffer is not working. First, Markov model is established for the system. Then transition equations are derived based on the system state analysis. After that, a solution technique is provided to obtain the results. Finally, numerical cases are carried out to explore the internal laws of the system. The relationships between system parameters and system performance are investigated. Furthermore, the difference between buffer subject to time-dependent failure and buffer subject to operation-dependent failure is discussed. The proposed method is the building block of approximate analytical methods which can greatly improve the accuracy when analyzing long systems.
引用
下载
收藏
页数:11
相关论文
共 50 条
  • [1] Analysis of two-machine lines with finite buffer, operation-dependent and time-dependent failure modes
    Matta, Andrea
    Simone, Francesca
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (06) : 1850 - 1862
  • [2] A two-machine flowshop problem with processing time-dependent buffer constraints-An application in multimedia presentations
    Lin, Feng-Cheng
    Hong, Jen-Shin
    Lin, Bertrand M. T.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) : 1158 - 1175
  • [3] Analysis of Two-machine Lines with Multiple Failure Modes and Unreliable Buffer
    Liu, Jun
    Liu, Jie
    Ru, Zhi-Yuan
    Zhao, Jun-Tian
    2008 IEEE INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING WORKSHOP PROCEEDINGS, VOLS 1 AND 2, 2008, : 36 - 39
  • [4] Minimizing Makespan with Start Time-Dependent Jobs in a Two-Machine Flow Shop
    Jafari, A. A.
    Zare, H. Khademi
    Lotfi, M. M.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (06): : 778 - 787
  • [5] Exact method for the two-machine flow-shop problem with time delays
    Mkadem, Mohamed Amine
    Moukrim, Aziz
    Serairi, Mehdi
    ANNALS OF OPERATIONS RESEARCH, 2021, 298 (1-2) : 375 - 406
  • [6] Exact method for the two-machine flow-shop problem with time delays
    Mohamed Amine Mkadem
    Aziz Moukrim
    Mehdi Serairi
    Annals of Operations Research, 2021, 298 : 375 - 406
  • [7] METHOD FOR TIME-DEPENDENT FAILURE RATES ANALYSIS.
    Lewis, S.H.
    Schmidt, L.A.
    1600, (15):
  • [8] METHOD FOR TIME-DEPENDENT FAILURE RATES ANALYSIS.
    Lewis, S.H.
    Schmidt, L.E.
    IBM Technical Disclosure Bulletin, 1973, 16 (05): : 1686 - 1688
  • [9] Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs
    Cheng, Mingbao
    Tadikamalla, Pandu R.
    Shang, Jennifer
    Zhang, Shaqing
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 234 (03) : 650 - 657
  • [10] Multi-state two-machine permutation flow shop scheduling optimisation with time-dependent energy costs
    Aghelinejad, Mohammad Mohsen
    Masmoudi, Oussama
    Ouazene, Yassine
    Yalaoui, Alice
    IFAC PAPERSONLINE, 2020, 53 (02): : 11156 - 11161