Experiment Research on the Maximum Temperature Difference during Concrete Hydration of Box Girder Bridge Construction

被引:0
|
作者
Yao Yue [1 ]
Lei Xiao [1 ]
Guo Zhigang [2 ]
机构
[1] Hohai Univ, Coll Civil & Transportat Engn, Nanjing, Jiangsu, Peoples R China
[2] Shanghai Inst Technol, Sch Railway Transportat, Shanghai, Peoples R China
关键词
box girder bridge; temperature difference; concrete hydration heat; temperature test;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The temperature data of a post-tensioned continuous concrete box-girder bridge have been monitored during concrete hydration period. Based on the measured data, the temperature in the different positions of the concrete box girder section was systemically analyzed to extract the max temperature difference. An experiment method for predicting the extremum temperature of concrete box-girder was proposed. The results show that a larger temperature difference between inside and outside concrete occurred in the course of hardening of concrete, the maximum temperature can reach 62.6 C. Therefore, some certain method to keep concrete surface in a warm mode is necessary. The results are useful in estimating the temperature difference in concrete box-girder construction.
引用
收藏
页码:532 / 535
页数:4
相关论文
共 50 条
  • [1] Research on Numerical Analysis of the Temperature Difference of Concrete Hydration of Box Girder Bridge
    Lei, X.
    Yao, Y.
    Guo, Z. G.
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTRICAL, AUTOMATION AND MECHANICAL ENGINEERING (EAME 2015), 2015, 13 : 506 - 508
  • [2] Temperature variation of concrete box girder bridge
    Wang J.
    Fang Z.
    Frontiers of Architecture and Civil Engineering in China, 2009, 3 (4): : 407 - 413
  • [3] Bridge information models for construction of a concrete box-girder bridge
    Lee, K. M.
    Lee, Y. B.
    Shim, C. S.
    Park, K. L.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2012, 8 (07) : 687 - 703
  • [4] Experimental Research on Hydration Heat Temperature of Concrete Box Girder in Low-Temperature Environment
    Sun, Wei-gang
    Liu, Lai-jun
    Wu, Qun-hu
    Feng, Jian-ping
    MECHANICAL ENGINEERING, MATERIALS SCIENCE AND CIVIL ENGINEERING II, 2014, 470 : 1045 - +
  • [5] COMPOSITE BOX GIRDER BRIDGE BEHAVIOR DURING CONSTRUCTION
    BRANCO, FA
    GREEN, R
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1985, 111 (03): : 577 - 593
  • [6] Dynamic response of a box girder bridge during construction
    Aas-Jakobsen, K
    Stommen, E
    Aas-Jakobsen, K
    WIND ENGINEERING INTO THE 21ST CENTURY, VOLS 1-3, 1999, : 827 - 832
  • [7] DESIGN AND CONSTRUCTION OF A MODEL PRESTRESSED CONCRETE BIFURCATED BOX GIRDER BRIDGE
    PERRY, SH
    WALDRON, P
    PINKNEY, MW
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 2-RESEARCH AND THEORY, 1985, 79 (SEP): : 439 - 454
  • [8] Research of Temperature Field of Long Span Concrete Box Girder Bridge Caused by Solar Radiation
    Jiang, Cunren
    Ren, Jianmin
    Wang, Zhuoling
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1635 - +
  • [9] Research of Vertical Prestressed Losses During Construction Process of PC Continuous Box Girder Bridge
    Zhang, Kechao
    Chen, Jianzhang
    Liu, Haiqiang
    Zheng, Yi
    ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 1142 - 1145
  • [10] DESIGN AND CONSTRUCTION OF A MODEL PRESTRESSED CONCRETE BIFURCATED BOX GIRDER BRIDGE.
    Perry, S.H.
    Waldron, P.
    Pinkney, M.W.
    Proceedings of the Institution of Civil Engineers (London), 1985, 79 (pt 2 1): : 439 - 454