A Business Continuity Management Simulator

被引:0
|
作者
Caelli, William J. [1 ]
Kwok, Lam-For [2 ]
Longley, Dennis [3 ]
机构
[1] Queensland Univ Technol, Informat Secur Inst, Brisbane, Qld 4001, Australia
[2] City Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China
[3] Int Informat Security Consultants Pty Ltd, Pacific Pines, Australia
关键词
BCM planning; simulator;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Comprehensive BCM plan testing for complex information systems is difficult and expensive, if not infeasible. This paper suggests that a simulator could be employed to ameliorate these problems. A general model for such a BCM simulator is presented, and the implementation of a prototype simulator is described. The simulator reacts to system disturbances by seeking alternative configurations provided within the BCM plan, reporting the resource availabilities in the updated system and identifying any failure to meet the requirements placed on the system. The simulator then explores any changes in data security introduced by the proposed post disturbance configuration and reports any enhanced risk.
引用
收藏
页码:9 / +
页数:2
相关论文
共 50 条
  • [1] BUSINESS CONTINUITY MANAGEMENT AS AN ORGANIZATION
    Komut, Mustafa
    [J]. ISTANBUL UNIVERSITY JOURNAL OF FACULTY OF POLITICAL SCIENCES-SIYASAL BILGILER FAKULTESI DERGISI, 2013, (49): : 101 - 116
  • [2] Issues in business continuity management
    Hill, R
    Burgess, S
    [J]. INFORMATION TECHNOLOGY AND ORGANIZATIONS: TRENDS, ISSUES, CHALLENGES AND SOLUTIONS, VOLS 1 AND 2, 2003, : 287 - 289
  • [3] Business Continuity Management System
    Aleksandrova, Svetlana V.
    Aleksandrov, Mark N.
    Vasiliev, Victor A.
    [J]. 2018 IEEE INTERNATIONAL CONFERENCE QUALITY MANAGEMENT, TRANSPORT AND INFORMATION SECURITY, INFORMATION TECHNOLOGIES (IT&QM&IS), 2018, : 14 - 17
  • [4] A framework for business continuity management
    Gibb, F
    Buchanan, S
    [J]. INTERNATIONAL JOURNAL OF INFORMATION MANAGEMENT, 2006, 26 (02) : 128 - 141
  • [5] CHANGES MANAGEMENT AS THE PRESUMPTION FOR BUSINESS CONTINUITY
    Valackiene, Asta
    Zostautiene, Daiva
    [J]. CHANGES IN SOCIAL AND BUSINESS ENVIRONMENT (CISABE'13), 2013, : 207 - 212
  • [6] Implementation system of business continuity management
    Kotulova, Hana
    [J]. POZARNI OCHRANA 2010, 2010, : 142 - 145
  • [7] Statistical models for business continuity management
    Bonafede, Concetto E.
    Cerchiello, Paola
    Giudici, Paolo
    [J]. JOURNAL OF OPERATIONAL RISK, 2007, 2 (04): : 79 - 96
  • [8] Business Continuity Management Planning Methodology
    Heng, Goh Moh
    [J]. INTERNATIONAL JOURNAL OF DISASTER RECOVERY AND BUSINESS CONTINUITY, 2015, 6 : 9 - 16
  • [9] Business Continuity Management bei Finanzdienstleistungsunternehmen
    Anna-Luisa Müller
    [J]. HMD Praxis der Wirtschaftsinformatik, 2014, 51 (3) : 339 - 349
  • [10] Business continuity management for Indonesian contractors
    Supriadi, Leni Sagita Riantini
    Pheng, Low Sui
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2013, 166 (01) : 31 - 42