The effect of risk aversion on the optimal project resource rate

被引:6
|
作者
Palit, Niladri [1 ]
Brint, Andrew [2 ]
机构
[1] Glasgow Caledonian Univ, Glasgow Sch Business & Soc, Cowcaddens Rd, Glasgow G4 0BA, Lanark, Scotland
[2] Univ Sheffield, Management Sch, 1 Conduit Rd, Sheffield S10 1FL, S Yorkshire, England
关键词
Game theory; project completion; resource rate; contract design; ACTIVITY TIMES; COMPLETION TIMES; CONTRACT DESIGN; MANAGEMENT; DURATION; OVERRUNS; FAIRNESS;
D O I
10.1016/j.ejor.2020.05.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Under resourcing a project increases the probability of a time overrun. Consequently, project contracts should be designed to encourage an appropriate allocation of resources to the project. A common way to encourage timely completion is to use contracts with time penalties and incentives linked to the completion time. If there are a number of competing contractors, then the project manager can employ a take it or leave it approach in designing the contract. However, where there are very few possible contractors, then a bargaining approach is more appropriate for the contract's construction. Therefore, this paper investigates how close the resource rate stemming from the Nash bargaining contract is to the optimal rate. Risk neutral and risk averse project managers and contractors are considered. It is found that when the contractor is risk neutral, the chosen resource rate is independent of the project completion time distribution no matter whether the project manager is risk neutral or risk averse, and it coincides with the optimal, i.e. centrally coordinated, rate. When the contractor is risk averse, the resource rate is dependent on the project completion time distribution. However, the results indicate that if the contractor is less risk averse than the project manager, then the resource rate is approximately the optimal one. Hence a time based contract designed using Nash bargaining is particularly suitable when the number of possible contractors is small and they are large enough with regard to the project size to be less risk averse than the project manager. (C) 2020 Elsevier B.V. All rights reserved.
引用
收藏
页码:1092 / 1104
页数:13
相关论文
共 50 条
  • [1] Benchmarking Discount Rate in Natural Resource Damage Assessment with Risk Aversion
    Wu, Desheng
    Chen, Shuzhen
    RISK ANALYSIS, 2017, 37 (08) : 1522 - 1531
  • [2] THE EFFECT OF TEMPORAL RISK-AVERSION ON OPTIMAL CONSUMPTION, THE EQUITY PREMIUM, AND THE EQUILIBRIUM INTEREST-RATE
    AHN, CM
    JOURNAL OF FINANCE, 1989, 44 (05): : 1411 - 1420
  • [3] Risk aversion in renewable resource harvesting
    Kelsall, Claudia
    Quaas, Martin F.
    Querou, Nicolas
    JOURNAL OF ENVIRONMENTAL ECONOMICS AND MANAGEMENT, 2023, 121
  • [4] Risk, risk aversion and the optimal time to produce
    Li, Qing
    IIE TRANSACTIONS, 2007, 39 (02) : 145 - 158
  • [5] UNCERTAINTY AVERSION, RISK-AVERSION, AND THE OPTIMAL CHOICE OF PORTFOLIO
    DOW, J
    WERLANG, SRD
    ECONOMETRICA, 1992, 60 (01) : 197 - 204
  • [6] OPTIMAL TAX STRUCTURES AND RISK AVERSION
    GANDHI, DK
    SAUNDERS, A
    RIVISTA INTERNAZIONALE DI SCIENZE ECONOMICHE E COMMERCIALI, 1979, 26 (03): : 286 - 291
  • [7] RISK AVERSION AND OPTIMAL MACRO POLICY
    MITCHELL, DW
    ECONOMIC JOURNAL, 1979, 89 (356): : 913 - 918
  • [8] Risk Aversion and Optimal Satellite Systems
    Daniels, Matthew
    Pate-Cornell, M. Elisabeth
    2015 IEEE AEROSPACE CONFERENCE, 2015,
  • [9] Optimal design, robustness, and risk aversion
    Newman, MEJ
    Girvan, M
    Farmer, JD
    PHYSICAL REVIEW LETTERS, 2002, 89 (02)
  • [10] Risk Aversion, Noise, and Optimal Investments
    Hardardottir, Hjordis
    Lundtofte, Frederik
    JOURNAL OF PORTFOLIO MANAGEMENT, 2017, 43 (03): : 51 - 59