Forecasting Workloads in Multi-step, Multi-route Business Processes

被引:3
|
作者
Oh, Sechan [1 ]
Strong, Ray [1 ]
Chandra, Anca [1 ]
Blomberg, Jeanette [1 ]
机构
[1] IBM Almaden Res Ctr, San Jose, CA 95120 USA
关键词
forecasting; business process management; workload management; Markov chain; service contracting;
D O I
10.1109/SCC.2014.54
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper presents a technique developed to forecast workloads in a business process. Business processes such as the process of engaging on a service contract consist of multiple steps that are not necessarily sequential. There can also be multiple routes that work can take in transition. In order to forecast workloads at different steps of such business processes, one needs to predict dynamic movements of process instances within the system as well as the arrival of new instances from outside. By analyzing transition log data, we construct a Markov chain, which models the movement of process instances across different steps of the business process. Our approach takes into account the fact that an instance's prior trajectory may affect its future transitions. Via numerical studies, we demonstrate the overall performance of the proposed forecasting method. We also investigate how the performance of the forecasting method changes as various characteristics of the business process change. The proposed technique is general, and can be applied to a large class of business processes.
引用
收藏
页码:355 / 361
页数:7
相关论文
共 50 条
  • [1] Multi-step forecasting for long-memory processes
    Brodsky, J
    Hurvich, CM
    [J]. JOURNAL OF FORECASTING, 1999, 18 (01) : 59 - 75
  • [2] Multi-step estimation for forecasting
    Clements, MP
    Hendry, DF
    [J]. OXFORD BULLETIN OF ECONOMICS AND STATISTICS, 1996, 58 (04) : 657 - +
  • [3] A nonparametric method of multi-step ahead forecasting in diffusion processes
    Yamamura, Mariko
    Shoji, Isao
    [J]. PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2010, 389 (12) : 2408 - 2415
  • [4] A TEST FOR IMPROVED MULTI-STEP FORECASTING
    Haywood, John
    Wilson, Granville Tunnicliffe
    [J]. JOURNAL OF TIME SERIES ANALYSIS, 2009, 30 (06) : 682 - 707
  • [5] Multi-step forecasting in the presence of breaks
    Hannikainen, Jari
    [J]. JOURNAL OF FORECASTING, 2018, 37 (01) : 102 - 118
  • [6] Direct multi-step estimation and forecasting
    Chevillon, Guillaume
    [J]. JOURNAL OF ECONOMIC SURVEYS, 2007, 21 (04) : 746 - 785
  • [7] Multi-step Forecasting via Multi-task Learning
    Jawed, Shayan
    Rashed, Ahmed
    Schmidt-Thieme, Lars
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON BIG DATA (BIG DATA), 2019, : 790 - 799
  • [8] Multi-Step Forecasting for Household Power Consumption
    Zheng, Yuanzhang
    Xu, Zhen
    Liao, Wei
    Lin, Binbin
    Chen, Jing
    [J]. IEEJ TRANSACTIONS ON ELECTRICAL AND ELECTRONIC ENGINEERING, 2023, 18 (08) : 1255 - 1263
  • [9] A multi-step forecasting method of time series
    Zhou, JB
    Wang, YK
    Yang, GY
    Zhao, YL
    [J]. 13TH CONFERENCE ON PROBABILITY AND STATISTICS IN THE ATMOSPHERIC SCIENCES, 1996, : 361 - 362
  • [10] Non-parametric direct multi-step estimation for forecasting economic processes
    Chevillon, G
    Hendry, DF
    [J]. INTERNATIONAL JOURNAL OF FORECASTING, 2005, 21 (02) : 201 - 218