Calculating and addressing uncertainty for risk-based allowable outage times

被引:5
|
作者
Smith, CL [1 ]
Knudsen, JK [1 ]
Calley, MB [1 ]
机构
[1] Lockheed Martin Idaho Technol, Idaho Natl Engn & Environm Lab, Idaho Falls, ID 83415 USA
关键词
AOT; risk assessment; uncertainty; Monte Carlo; Boolean difference; correlation;
D O I
10.1016/S0951-8320(99)00018-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article examines the calculation and treatment of uncertainty in risk-based allowable outage times (AOTs) for operational control at nuclear power plants, where an AOT is defined as the time that a component or system is permitted to be out of service. The US Nuclear Regulatory Commission NRC has explored the possibility of using a nuclear power plant's probabilistic risk assessment results to determine component or system AOTs. The analysis and results from previous work prepared for the NRC on determining risk-based AOTs are presented. As part of the discussion, the article examines the inherent uncertainty in calculating risk-based AOTs and presents the difficulties in calculating these risk-based AOTs. It is noted that care should be taken when dealing with uncertainty analysis results where a time-interval is the outcome of the analysis. In addition, potential improvements in the mechanism of calculating risk-based AOTs are suggested. (C) 1999 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:41 / 47
页数:7
相关论文
共 50 条
  • [1] Calculating and addressing uncertainty for risk-based allowable outage times
    Smith, C.L.
    Knudsen, J.K.
    Calley, M.B.
    Reliability Engineering and System Safety, 1999, 66 (01): : 41 - 47
  • [2] RISK-BASED ANALYSIS OF ALLOWED OUTAGE TIMES IN NUCLEAR-POWER PLANTS
    SAMANTA, PK
    WONG, SM
    BOCCIO, JL
    VESELY, WE
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 50 (NOV): : 359 - 361
  • [3] GENCO's risk-based maintenance outage scheduling
    Wu, Lei
    Shahidehpour, Mohammad
    Li, Tao
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (01) : 127 - 136
  • [4] On Risk-Based Expression of Hydrographic Uncertainty
    Calder, Brian R.
    MARINE GEODESY, 2015, 38 (02) : 99 - 127
  • [5] Risk-based, genetic algorithm approach to optimize outage maintenance schedule
    Hadavi, S. Mohammad Hadi
    ANNALS OF NUCLEAR ENERGY, 2008, 35 (04) : 601 - 609
  • [6] Risk-based nonstationary design flood and uncertainty analysis
    Du T.
    Xiong L.
    Li S.
    Shao J.
    Xu C.
    Yan L.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2018, 49 (02): : 241 - 253
  • [7] Handling Knowledge Uncertainty in Risk-Based Requirements Engineering
    Cailliau, Antoine
    van Lamsweerde, Axel
    2015 IEEE 23RD INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE (RE), 2015, : 106 - 115
  • [8] Risk-based reliability assessment under epistemic uncertainty
    Khalaj, M.
    Makui, A.
    Tavakkoli-Moghaddam, R.
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2012, 25 (03) : 571 - 581
  • [9] A comparison between robust and risk-based optimization under uncertainty
    Beck, Andre T.
    Gomes, Wellison J. S.
    Lopez, Rafael H.
    Miguel, Leandro F. F.
    STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2015, 52 (03) : 479 - 492
  • [10] Design of Risk-Based Univariate Control Charts With Measurement Uncertainty
    Katona, Attila I.
    Saghir, Aamir
    Hegedus, Csaba
    Kosztyan, Zsolt T.
    IEEE ACCESS, 2023, 11 : 97567 - 97573