MIXED-MODEL ASSEMBLY LINE SCHEDULING IN CONSIDERATION OF WALKING BACK TIME AND LINE STOPS

被引:0
|
作者
Kurashige, Kenji [1 ]
Yanagawa, Yoshinari [1 ]
机构
[1] Kagoshima Prefectural Coll, Kagoshima, Japan
关键词
Mixed-Model Assembly Line; Time-Based Goal Chasing Method (TBGC); Line Stop; Walking Back Time; PRODUCTION SYSTEMS;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The time-based goal chasing method (TBGC) has been proposed to keep the consumption rate of each part constant in consideration of the different assembly time. The good position of TBGC is able to consider the influence of idle time and line stop time in the total assembly time. We formulated work situations including line stop time and applied TBGC to assembly line with multiple work stations. However, the assembly line model is simplified under some assumptions. In this paper, we newly consider walking back time and simultaneous tasks with an adjacent worker in addition to the assembly line model in the past study.
引用
收藏
页码:78 / 83
页数:6
相关论文
共 50 条
  • [1] Mixed-model assembly line scheduling in consideration of idle time and line stops
    Kurashige, K
    Yanagawa, Y
    Miyazaki, S
    Kameyama, Y
    [J]. ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 91 - 96
  • [2] EXPERT SYSTEM MIXED-MODEL ASSEMBLY LINE SCHEDULING
    VARGAS, JE
    PISHORI, R
    NATU, R
    KEE, CJ
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 1992, 5 (1-2) : 79 - 85
  • [3] MIXED-MODEL ASSEMBLY LINE PROBLEM WITH CONSIDERATION OF CONVEYER SPEED
    Kurashige, Kenji
    Yanagawa, Yoshinari
    [J]. ICIM'2016: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2016, : 24 - 31
  • [4] JIT Single Vehicle Scheduling in a Mixed-Model Assembly Line
    Rao, Yun-Qing
    Wang, Meng-Chang
    Wang, Kun-Peng
    [J]. MECHATRONICS AND INTELLIGENT MATERIALS, PTS 1 AND 2, 2011, 211-212 : 770 - 774
  • [5] A sequencing method for the mixed-model assembly line in consideration of the car's delivery time
    Hugejile
    Hiraki, Shusaku
    Zhuqi, X.U.
    [J]. Journal of Japan Industrial Management Association, 2009, 60 (01) : 11 - 18
  • [6] Mixed-model assembly line scheduling using the Lagrangian relaxation technique
    Zhang, YH
    Luh, PB
    Yoneda, K
    Kano, T
    Kyoya, Y
    [J]. IIE TRANSACTIONS, 2000, 32 (02) : 125 - 134
  • [7] Mixed-model assembly line scheduling using the Lagrangian relaxation technique
    Zhang, Yuanhui
    Luh, Peter B.
    Yoneda, Kiyoshi
    Kano, Toshiyuki
    Kyoya, Yuji
    [J]. IIE Transactions (Institute of Industrial Engineers), 2000, 32 (02): : 125 - 134
  • [8] Mixed-model assembly line scheduling using the Lagrangian relaxation technique
    Zhang, YH
    Luh, PB
    Yoneda, K
    Kano, T
    Kyoya, Y
    [J]. PROCEEDINGS OF THE 1997 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS, 1997, : 429 - 434
  • [9] AN ENERGY SAVING SCHEDULING METHOD FOR JUST IN TIME MATERIAL HANDLING IN MIXED-MODEL ASSEMBLY LINE
    Hu, Liman
    Zhou, Binghai
    Li, Yang
    [J]. PROCEEDINGS OF THE ASME 12TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE - 2017, VOL 4, 2017,
  • [10] Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
    Rao, Yun-Qing
    Wang, Meng-Chang
    Wang, Kun-Peng
    Wu, Tou-Ming
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (11) : 2599 - 2610