共 50 条
- [1] Integrated vendor–buyer cooperative inventory model with controllable lead time, ordering cost reduction, and service-level constraint [J]. The International Journal of Advanced Manufacturing Technology, 2013, 65 : 657 - 666
- [6] Integrated Vendor-Buyer Inventory Model Considering Imperfect Quality and Inspection Errors with Controllable Lead Time [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1321 - 1325
- [9] A vendor-buyer stochastic inventory model with lead time reduction in supply chain [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2542 - +