The energy scheduling problem: Industrial case-study and constraint propagation techniques

被引:70
|
作者
Artigues, Christian [1 ,2 ]
Lopez, Pierre [1 ,2 ]
Hait, Alain [3 ]
机构
[1] CNRS, LAAS, F-31077 Toulouse, France
[2] Univ Toulouse, LAAS, UPS INSA INP ISAE, F-31077 Toulouse, France
[3] Univ Toulouse, Inst Superieur Aeronaut & Espace, F-31055 Toulouse, France
关键词
Production scheduling; Energy constraints; Constraint propagation; Energetic reasoning; PARALLEL; SEARCH; TASKS;
D O I
10.1016/j.ijpe.2010.09.030
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with production scheduling involving energy constraints, typically electrical energy. We start by an industrial case-study for which we propose a two-step integer/constraint programming method. From the industrial problem we derive a generic problem, the Energy Scheduling Problem (EnSP). We propose an extension of specific resource constraint propagation techniques to efficiently prune the search space for EnSP solving. We also present a branching scheme to solve the problem via tree search. Finally, computational results are provided. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:13 / 23
页数:11
相关论文
共 50 条
  • [1] Constraint propagation techniques for the disjunctive scheduling problem
    Dorndorf, U
    Pesch, E
    Toàn, PH
    ARTIFICIAL INTELLIGENCE, 2000, 122 (1-2) : 189 - 240
  • [2] Propagation techniques of resource constraint for cumulative scheduling
    Roger Kameugne
    Constraints, 2015, 20 (4) : 506 - 507
  • [3] INDUSTRIAL MARKETING AS AN ORGANIZATIONAL PROBLEM - CASE-STUDY
    HAKANSSON, H
    WOOTZ, B
    ANDERSSON, O
    HANGARD, P
    EUROPEAN JOURNAL OF MARKETING, 1979, 13 (03) : 81 - 93
  • [4] A ROUTING AND SCHEDULING PROBLEM FOR A RAIL SYSTEM - A CASE-STUDY
    ABEL, DJ
    STARK, KP
    MURRY, CR
    DEMOULIN, YM
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1981, 32 (09) : 767 - 774
  • [5] INDUSTRIAL BENCHMARKING - A CASE-STUDY OF PERFORMANCE ANALYSIS TECHNIQUES
    SCHEFCZYK, M
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (01) : 1 - 11
  • [6] A Study of Resource Constraint Project Scheduling Problem for Energy Saving
    Miyamoto, Toshiyuki
    Mori, Kazuyuki
    Kitamura, Shoichi
    Izui, Yoshio
    2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND ENGINEERING (ICSSE), 2014, : 23 - 26
  • [7] STRUCTURING INDUSTRIAL ENERGY USE - A UK CASE-STUDY
    CATTELL, RK
    ENERGY ECONOMICS, 1982, 4 (04) : 268 - 275
  • [8] Augmented ε-constraint method in multiobjective staff scheduling problem: a case study
    Seyed Jafar Sadjadi
    Mehdi Heidari
    Amin Alinezhad Esboei
    The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1505 - 1514
  • [9] Augmented ε-constraint method in multiobjective staff scheduling problem: a case study
    Sadjadi, Seyed Jafar
    Heidari, Mehdi
    Esboei, Amin Alinezhad
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (5-8): : 1505 - 1514
  • [10] Case-Study Techniques
    Gaw, Esther Allen
    JOURNAL OF HIGHER EDUCATION, 1943, 14 (01): : 37 - +