共 50 条
- [6] A Study of Resource Constraint Project Scheduling Problem for Energy Saving 2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND ENGINEERING (ICSSE), 2014, : 23 - 26
- [8] Augmented ε-constraint method in multiobjective staff scheduling problem: a case study The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1505 - 1514
- [9] Augmented ε-constraint method in multiobjective staff scheduling problem: a case study INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (5-8): : 1505 - 1514