Finite Element Analysis Simulation of the South-to-North Water Diversion Bridge during Cantilever Construction

被引:0
|
作者
Ma, Hua [1 ]
机构
[1] Management Off Xingtai Hengshui Expressway, Xingtai 054000, Hebei, Peoples R China
关键词
Corrugated steel web; Cantilever construction; FEA simulation; Normal stress; STEEL; WEBS;
D O I
10.4028/www.scientific.net/AMM.204-208.2114
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Use the Finite Element Analysis software to numerically simulate the South-to-North Water Diversion Bridge, a prestressed concrete composite box-girder bridge with corrugated steel webs, during the process of cantilever construction. Then research the force condition of the main girder structure during the construction processes. Results indicated that, during each construction process, the bending moment was reasonable, and all sections of the main girder structure were under pressure. The maximum normal stress always appeared around those cross-sections over the main piers, and during the mid-span closure process, the maximum stress appeared around the mid-span segment's bottom flange.
引用
收藏
页码:2114 / 2118
页数:5
相关论文
共 50 条
  • [1] Analysis of the Superstructure of South-to-North Water Diversion Bridge
    Li, Minghong
    Wang, Yili
    Wan, Shui
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2125 - 2130
  • [2] Numerical Analysis on the Dynamic Characteristics of South-to-North Water Division Bridge during the Cantilever Construction Stage
    Zuo, Junchao
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2200 - 2204
  • [4] Buffer Strip Construction in South-to-North Water Diversion Project
    Chi Yixia
    Li Zhenquan
    Zhang Zhanyu
    PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL II, 2010, : 435 - +
  • [5] The construction management of South-to-North Water Diversion Project of China
    Liu, Yuan Shu
    Yan, Fu Zhang
    He, Yuri Hua
    Gao, Yu Ping
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 847 - 853
  • [6] Stress Monitoring on Cantilever Construction Stage of the Main Bridge of South-to-North Water Transfers Canal
    Du, Qing
    Yang, Yipeng
    Li, Xiaohui
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1213 - +
  • [7] Analysis on construction management mode of China's South-to-North Water Diversion Project
    Liu Rui
    Zhao Zhenyu
    Wu Yunna
    Huang Yonguang
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 110 - 114
  • [8] An institutional analysis of China's South-to-North water diversion
    Wang, Mark
    Li, Chen
    THESIS ELEVEN, 2019, 150 (01) : 68 - 80
  • [9] The south-to-north water diversion (SNWD) project
    Zhang, QF
    FRONTIERS IN ECOLOGY AND THE ENVIRONMENT, 2005, 3 (02) : 76 - 76
  • [10] Reliability model of organization management chain of South-to-North Water Diversion Project during construction period
    Feng Jingchun
    Zhou Yang
    Hong Yuzhen
    Zhao Shixin
    Ren Xiaoqiang
    WATER SCIENCE AND ENGINEERING, 2008, 1 (04) : 107 - 113