Single machine total tardiness maximization problems: complexity and algorithms

被引:6
|
作者
Gafarov, Evgeny R. [1 ]
Lazarev, Alexander A. [1 ]
Werner, Frank [2 ]
机构
[1] Russian Acad Sci, Inst Control Sci, Moscow 117997, Russia
[2] Univ Magdeburg, Fak Math, D-39016 Magdeburg, Germany
基金
俄罗斯基础研究基金会;
关键词
Scheduling; Single machine maximization problems; Complexity; Dynamic programming; FLEXIBLE SOLUTIONS;
D O I
10.1007/s10479-012-1288-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider some scheduling problems on a single machine, where weighted or unweighted total tardiness has to be maximized in contrast to usual minimization problems. These problems are theoretically important and have also practical interpretations. For the total weighted tardiness maximization problem, we present an NP-hardness proof and a pseudo-polynomial solution algorithm. For the unweighted total tardiness maximization problem with release dates, NP-hardness is proven. Complexity results for some other classical objective functions (e.g., the number of tardy jobs, total completion time) and various additional constraints (e.g., deadlines, weights and/or release dates of jobs may be given) are presented as well.
引用
收藏
页码:121 / 136
页数:16
相关论文
共 50 条
  • [1] Single machine total tardiness maximization problems: complexity and algorithms
    Evgeny R. Gafarov
    Alexander A. Lazarev
    Frank Werner
    Annals of Operations Research, 2013, 207 : 121 - 136
  • [2] Single machine total weighted tardiness problem with genetic algorithms
    Ferrolho, Antonio
    Crisostomo, Manuel
    2007 IEEE/ACS INTERNATIONAL CONFERENCE ON COMPUTER SYSTEMS AND APPLICATIONS, VOLS 1 AND 2, 2007, : 1 - +
  • [3] Approximation algorithms for minimizing the total weighted tardiness on a single machine
    Kolliopoulos, SG
    Steiner, G
    THEORETICAL COMPUTER SCIENCE, 2006, 355 (03) : 261 - 273
  • [4] Algorithms for some maximization scheduling problems on a single machine
    E. R. Gafarov
    A. A. Lazarev
    F. Werner
    Automation and Remote Control, 2010, 71 : 2070 - 2084
  • [5] Algorithms for Some Maximization Scheduling Problems on a Single Machine
    Gafarov, E. R.
    Lazarev, A. A.
    Werner, F.
    AUTOMATION AND REMOTE CONTROL, 2010, 71 (10) : 2070 - 2084
  • [6] An investigation on single machine total weighted tardiness scheduling problems
    Ponnambalam, S.G. (sgponnambalam@yahoo.com), 1600, Springer-Verlag London Ltd (22): : 3 - 4
  • [7] An investigation on single machine total weighted tardiness scheduling problems
    R. Maheswaran
    S. G. Ponnambalam
    The International Journal of Advanced Manufacturing Technology, 2003, 22 : 243 - 248
  • [8] An investigation on single machine total weighted tardiness scheduling problems
    Maheswaran, R
    Ponnambalam, SG
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (3-4): : 243 - 248
  • [9] Algorithms for single machine total tardiness scheduling with sequence dependent setups
    Gupta, Skylab R.
    Smith, Jeffrey S.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 722 - 739
  • [10] ALGORITHMS FOR A CLASS OF SINGLE-MACHINE WEIGHTED TARDINESS AND EARLINESS PROBLEMS
    YANO, CA
    KIM, YD
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) : 167 - 178