共 50 条
- [1] Study on Work Time in Bra Sewing Assembly Line [J]. TEXTILE BIOENGINEERING AND INFORMATICS SYMPOSIUM PROCEEDINGS, VOLS 1 AND 2, 2009, : 454 - 460
- [2] Studying the Applications of the 0-1 Planning in Bra Sewing Process Arrangement Optimization [J]. TEXTILE BIOENGINEERING AND INFORMATICS SYMPOSIUM PROCEEDINGS, VOLS 1-3, 2011, : 920 - 927
- [3] Study of Carbon Footprint Assessment Method for Moulded Bra Cup Product in the Production Process [J]. TEXTILE BIOENGINEERING AND INFORMATICS SYMPOSIUM PROCEEDINGS, VOLS 1 AND 2, 2012, : 668 - 673
- [4] PROBLEM OF PRODUCTION PROCESS ARRANGEMENT (OPTIMIZATION METHOD FOR ARRANGEMENT ANALYSIS). [J]. Nippon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 1987, 53 (493): : 2060 - 2065
- [5] THE PROBLEM OF PRODUCTION PROCESS ARRANGEMENT (OPTIMIZATION METHOD FOR ARRANGEMENT ANALYSIS) [J]. JSME INTERNATIONAL JOURNAL SERIES III-VIBRATION CONTROL ENGINEERING ENGINEERING FOR INDUSTRY, 1988, 31 (01): : 157 - 163
- [6] New process opens way to combined production [J]. EUROPEAN CHEMICAL NEWS, 1996, 66 (1731): : 22 - 22
- [7] The reengineering of the production process of new production line of a factory [J]. FIFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGMENT SCIENCE: PROCEEDINGS OF IE & MS '98, 1998, : 102 - 105
- [10] Study of a new one-way timing method [J]. SCIENCE CHINA-PHYSICS MECHANICS & ASTRONOMY, 2012, 55 (12) : 2476 - 2481