Determining Priority of Power Transformer Replacement Project by Using Fuzzy AHP Method

被引:0
|
作者
Harianti, Shanti [1 ]
Purnomo, Mauridhi Hery [2 ]
机构
[1] Unit Pelaksana Transmisi Surabaya Perencanaan & E, Surabaya, Indonesia
[2] Elect Engn Inst, Teknol Sepuluh Nopember Elect Engn, Surabaya, Indonesia
关键词
Power Transformers; Dissolved Gas Analysis; Duval; Fuzzy; AHP;
D O I
10.1109/icts.2019.8850968
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
At present electricity is a primary need that must be used, because it will trigger the economic development of a region and country. In a distribution of electric power, the transformer is one of the most important assets because it can change the voltage level until it can be distributed, it is also the most expensive asset of all equipment in the substation. The expensive investment cost of a transformer causes the priority to be replaced according to the level of urgency, so that the costs to be incurred are proportional to the returns obtained. By knowing the condition of the transformer early can prevent the occurrence of interference that can cause power outages or black out. KEPDIR 149 concerning the replacement of the Main Transmission Equipment and in this case the transformer contains the criteria used to make the replacement for PLN. These criteria will be used to prioritize what transformers will be replaced, it is technical criteria, operating age, and level of risk by using AIM method. The results of the research it was found that technical conditions have the greatest influence because they have a weight of 0.4, and 0,3 for each age and risk level criteria based on the interview of top management. Whereas for the power transformer No. 2 is the transformer with the highest priority, with DGA condition is T3, 23 years operation and high level of risk.
引用
收藏
页码:114 / 119
页数:6
相关论文
共 50 条
  • [1] Determining priority infrastructure provision for supporting agrotourism development using AHP method
    Tonny, J.
    Wulan, P.
    [J]. INTERNATIONAL CONFERENCE ON INNOVATION IN ENGINEERING AND VOCATIONAL EDUCATION 2019 (ICIEVE 2019), PTS 1-4, 2020, 830
  • [2] Determining the importance of the criteria of traffic accessibility using fuzzy ahp and rough ahp method
    Stankovic M.
    Gladovic P.
    Popovic V.
    [J]. Decision Making: Applications in Management and Engineering, 2019, 2 (01): : 86 - 104
  • [3] Using AHP for determining priority in a safety management system
    Chan, AHS
    Kwok, W
    Duffy, VG
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (5-6) : 430 - 445
  • [4] Determining the priority level of suppliers by using AHP and TOPSIS
    Napitupulu, Humala L.
    [J]. 1ST INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING, 2019, 505
  • [5] Comprehensive Evaluation of Thermal Power Denitration Project Based on Fuzzy AHP Method
    Zhao, Jianna
    Liu, Jiazhen
    [J]. 2014 INTERNATIONAL CONFERENCE ON ENVIRONMENTAL POLLUTION AND PUBLIC HEALTH (EPPH 2014), VOL 3, 2014, 3 : 67 - 72
  • [6] Analysis of transformer state by fuzzy TOPSIS and AHP method
    Bartlomiejczyk, Mikolaj
    Gutten, Miroslav
    Hamacek, Stefan
    [J]. PROCCEDINGS OF THE 2014 15TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2014,
  • [7] Project management using the developed AHP-VIKOR method with the fuzzy approach
    Milojkovic, Ivan
    Prascevic, Natasa
    [J]. WATER SCIENCE AND TECHNOLOGY, 2024, 90 (02) : 578 - 597
  • [8] Evaluating Weight Priority on Green Building Using Fuzzy AHP
    Galvani, Robastian Yudha
    Effendy, Nazrul
    Kusumawanto, Arif
    [J]. 2018 12TH SOUTH EAST ASIAN TECHNICAL UNIVERSITY CONSORTIUM (SYMPOSIUM SEATUC 2018): ENGINEERING EDUCATION AND RESEARCH FOR SUSTAINABLE DEVELOPMENT, 2018,
  • [9] A stochastic model for facility locations using the priority of fuzzy AHP
    Sekerci, Abdullah Zubeyr
    Aydin, Nezir
    [J]. SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2022, 40 (03): : 649 - 662
  • [10] Risk Priority Evaluation for Power Transformer Parts Based on Intuitionistic Fuzzy Preference Selection Index Method
    Jiang, Minglin
    Ren, Haiping
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022