DTCTP with Renewable and Nonrenewable Resources

被引:1
|
作者
Peng, Wuliang [1 ]
Yu, Hong [2 ]
机构
[1] Shenyang Ligong Univ, Sch Econ & Management, Shenyang 110168, Peoples R China
[2] Shenyang Ligong Univ, Sch Mech Engn, Shenyang 110168, Peoples R China
关键词
Project Management; Project Scheduling; Discrete Time-cost Trade-off; Planning and Scheduling;
D O I
10.1109/CCDC.2008.4597292
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The traditional DTCTP is improved to a new multi-mode resource-constrained DTCTP model (MRC-DTCTP). Referring to the multi-mode resource-constrained project scheduling problem (MRCPSP), both the renewable resources and nonrenewable resources constraints are added to DTCTP. By predefining the resource price, the renewable resources are related to the project costs, including direct cost and indirect cost. Every activity can be executed in the crashing way in which the project direct costs are used to shorten the activity duration. According to the characteristics of the MRC-DTCTP, a brand and bound algorithm for solving it is developed. Finally an entire time-cost tradeoff curve for a project network is drawn, and it is shown that MRC-DTCTP can effectively help to balance the relationship between project duration and cost.
引用
收藏
页码:170 / +
页数:2