HYDRO-MECHANICAL ISSUES OF OFFLOADING OPERATIONS BETWEEN A FLOATING LNG TERMINAL AND A LNG CARRIER IN SIDE-BY-SIDE CONFIGURATION

被引:0
|
作者
Lecuyer, Bruno [1 ]
Ledoux, Alain
Molin, Bernard
Le Boulluec, Marc
Heguiaphal, Begnat [1 ]
机构
[1] PRINCIPIA SAS, La Ciotat, France
关键词
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This paper presents a state-of-the-art methodology to build a numerical hydro-mechanical model of a floating LNG Terminal with a LNG carrier moored alongside, complying with the physical mechanical behavior and hydrodynamic phenomenology involved in such a complex system. The required numerical functions are available for intensive engineering applications in the PRINCIPIA's software DIODORE (TM) dedicated to sea-keeping and mooring analysis. The methodology has been validated by comparison with non-captive model tests in IFREMER basin in the frame of the SALT 2 JIP led by PRINCIPIA. The paper describes first the academic side-by-side case that has been tested in basin, associated with the comparison between the experimental results and the numerical application using DIODORE (TM) In a second step, the main physical parameters of the simulation are analyzed and some gained insights are exposed.
引用
收藏
页码:495 / 504
页数:10
相关论文
共 25 条
  • [1] Experimental study on hydrodynamic characteristics and operational feasibility of floating LNG bunkering terminal moored side-by-side with LNG Carrier and two LNG bunkering shuttles
    Kim, YunHo
    Jung, DongWoo
    Cho, SeokKyu
    Sung, HongGun
    [J]. SHIPS AND OFFSHORE STRUCTURES, 2018, 13 (05) : 504 - 518
  • [2] Relative motions between LNG-FPSO and side-by-side positioned LNG carrier in waves
    Kim, MS
    Ha, MK
    Kim, BW
    [J]. PROCEEDINGS OF THE THIRTEENTH (2003) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 2003, : 210 - 217
  • [3] Feasibility stage assessment of side-by-side LNG offloading operation
    Wong, Jun
    Paton, Colin
    Morandini, Cedric
    Withall, Timothy
    Kilner, Andrew
    [J]. Proceedings of the 26th International Conference on Offshore Mechanics and Arctic Engineering, Vol 1, 2007, : 629 - 638
  • [4] GAP EFFECTS AT SIDE-BY-SIDE LNG-TRANSFER OPERATIONS
    Clauss, Guenther F.
    Dudek, Matthias
    Testa, Daniel
    [J]. PROCEEDINGS OF THE ASME 32ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING - 2013 - VOL 1: OFFSHORE TECHNOLOGY, 2013,
  • [5] LNG floating regasification unit (FRU) side-by-side mooring analysis
    Ye, Wei
    Luo, Yong
    Pollack, Jack
    [J]. Proceedings of the 24th International Conference on Offshore Mechanics and Arctic Engineering - 2005 - Vol 1, Pts A and B, 2005, : 245 - 254
  • [6] HYDRODYNAMIC INTERACTION BETWEEN FLNG VESSEL AND LNG CARRIER IN SIDE BY SIDE CONFIGURATION
    Zhao Wen-hua
    Yang Jian-min
    Hu Zhi-qiang
    [J]. JOURNAL OF HYDRODYNAMICS, 2012, 24 (05) : 648 - 657
  • [8] Hydrodynamic Interaction Between FLNG Vessel and LNG Carrier in Side by Side Configuration
    Wen-hua Zhao
    Jian-min Yang
    Zhi-qiang Hu
    [J]. Journal of Hydrodynamics, 2012, 24 : 648 - 657
  • [9] Operational control based on environmental detector for floating LNG connection system during side-by-side offloading operation
    Liang, Xiaoling
    Zhang, Yuxiang
    Ge, Shuzhi Sam
    How, Bernard Voon Ee
    [J]. NONLINEAR DYNAMICS, 2021, 106 (03) : 2293 - 2307
  • [10] A computational study of wave effects related to side-by-side LNG offloading.
    Teigen, P.
    Niedzwecki, J. M.
    [J]. PROCEEDINGS OF THE SIXTEENTH (2006) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 2006, : 238 - 247