共 50 条
- [1] An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times [J]. Annals of Operations Research, 2012, 196 : 635 - 650
- [3] A multi-level capacitated lot-sizing problem with energy consideration [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1352 - 1359
- [8] A Heuristic Solution of Multi-Item Single Level Capacitated Dynamic Lot-Sizing Problem with Setup Time [J]. ADVANCES IN MATERIALS AND PROCESSING TECHNOLOGIES II, PTS 1 AND 2, 2011, 264-265 : 1794 - 1801