An Alternative Solution to the Software Project Scheduling Problem

被引:1
|
作者
Crawford, Broderick [1 ,2 ,3 ]
Soto, Ricardo [1 ,4 ,5 ]
Astorga, Gino [1 ]
Olguin, Eduardo [2 ]
机构
[1] Pontificia Univ Catolica Valparaiso, Valparaiso, Chile
[2] Univ San Sebastian, Providencia, Chile
[3] Univ Cent Chile, Santiago, Chile
[4] Univ Autonoma Chile, Temuco, Chile
[5] Univ Cient Sur, Lima, Peru
关键词
Intelligent Water Drops; Project management; Software Project Scheduling Problem; WATER DROPS ALGORITHM; OPTIMIZATION;
D O I
10.1007/978-3-319-33625-1_45
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Due to the competitiveness of the software industry a more stressful tasks for software project managers allocation of the human resources to the different tasks that perform the project. This is not an easy task and it is necessary that is computationally supported since every day projects are larger and these should be developed in the shortest time and possible costs. We propose to use a constructive metaheuristics called Intelligent Water Drops. In this paper the result are compared with another constructive metaheuristics obtaining promising performance.
引用
收藏
页码:501 / 510
页数:10
相关论文
共 50 条
  • [1] A survey on the Software Project Scheduling Problem
    Angel Vega-Velazquez, Miguel
    Garcia-Najera, Abel
    Cervantes, Humberto
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 202 : 145 - 161
  • [2] Metaheuristics to solve the software project scheduling problem
    Parra, Nimo
    Carolina, Dahyana
    Salazar, Amaya
    Edgar, Jhon
    [J]. 2012 XXXVIII CONFERENCIA LATINOAMERICANA EN INFORMATICA (CLEI), 2012,
  • [3] The Use of Metaheuristics to Software Project Scheduling Problem
    Crawford, Broderick
    Soto, Ricardo
    Johnson, Franklin
    Misra, Sanjay
    Paredes, Fernando
    [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2014, PT V, 2014, 8583 : 215 - +
  • [4] Algebraic Solution of a Problem of Optimal Project Scheduling in Project Management
    Krivulin, N. K.
    Gubanov, S. A.
    [J]. VESTNIK ST PETERSBURG UNIVERSITY-MATHEMATICS, 2021, 54 (01) : 58 - 68
  • [5] Algebraic Solution of a Problem of Optimal Project Scheduling in Project Management
    N. K. Krivulin
    S. A. Gubanov
    [J]. Vestnik St. Petersburg University, Mathematics, 2021, 54 : 58 - 68
  • [6] A Scheduling Problem for Software Project Solved with ABC Metaheuristic
    Crawford, Broderick
    Soto, Ricardo
    Johnson, Franklin
    Vargas, Melissa
    Misra, Sanjay
    Paredes, Fernando
    [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2015, PT IV, 2015, 9158 : 628 - 639
  • [7] Solving the Software Project Scheduling Problem with Hyper-heuristics
    de Andrade, Joaquim
    Silva, Leila
    Britto, Andre
    Amaral, Rodrigo
    [J]. ARTIFICIAL INTELLIGENCEAND SOFT COMPUTING, PT I, 2019, 11508 : 399 - 411
  • [8] Hybrid approach for solving resourceconstrained software project scheduling problem
    Gul, Nurhan
    Arici, Nursal
    [J]. JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
  • [9] An Evolutionary Hyper-heuristic for the Software Project Scheduling Problem
    Wu, Xiuli
    Consoli, Pietro
    Minku, Leandro
    Ochoa, Gabriela
    Yao, Xin
    [J]. PARALLEL PROBLEM SOLVING FROM NATURE - PPSN XIV, 2016, 9921 : 37 - 47
  • [10] SOFTWARE PROJECT SCHEDULING
    ABDELHAMID, TK
    MADNICK, SE
    [J]. INFORMATION & MANAGEMENT, 1983, 6 (03) : 186 - 186