Fuzzy Inference Systems, ASKE, Knowledge Value Added, and Monte Carlo Risk Simulation for Evaluating Intangible Human Capital Investments

被引:0
|
作者
Mun, Johnathan [1 ]
de Albuquerque, Nelson R. [2 ]
Liong, Choong-Yeun [3 ]
Salleh, Abdul Razak [3 ]
机构
[1] US Naval, Postgrad Sch, 1 Univ Circle, Monterey, CA 93943 USA
[2] Pontificia Univ Catolica Rio De Janeir, BR-451900 Rio De Janeiro, Brazil
[3] Univ Kebangsaan Malaysia, Fac Sci & Technol, Sch Math Sci, Bangi 46300, Selangor DE, Malaysia
关键词
Intangible asset; proxy variable; human capital; KVA; fuzzy logic; simulation;
D O I
10.1063/1.4801263
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper presents the ASKE-Risk method, coupled with Fuzzy Inference Systems, and Monte Carlo Risk Simulation to measure and prioritize Individual Technical Competence of a value chain to assess changes in the human capital of a company. ASKE is an extension of the method Knowledge Value Added, which proposes the use of a proxy variable for measuring the flow of knowledge used in a key process, creating a relationship between the company's financial results and the resources used in each of the business processes.
引用
收藏
页码:1166 / 1175
页数:10
相关论文
共 5 条
  • [1] The Monte Carlo Simulation Analysis of Enterprise Investment Risk in Human Capital Education
    Xi Xudong
    Yang Jianhua
    Song Xiaoqian
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 1928 - 1934
  • [2] On the Risk of Enterprise Investment in Human Capital Education Based on Monte Carlo Simulation Method
    Yang Jianhua
    Gao Zhaojin
    [J]. RECENT ADVANCE IN STATISTICS APPLICATION AND RELATED AREAS, VOLS I AND II, 2009, : 1019 - 1026
  • [3] Analysis on the Risk of Enterprise Investment in Human Capital Education Based on Monte Carlo Simulation
    Wang Yongsheng
    Yang Jianhua
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1180 - +
  • [4] Study on the Education Investment Risk of Enterprise Human Capital Based on Monte Carlo Simulation Method
    Yang, Jianhua
    Gao, Zhaojin
    [J]. JOURNAL OF COMPUTERS, 2012, 7 (03) : 779 - 784
  • [5] Achieving 'best value' for the community by deployment of risk based cost estimation using Monte-Carlo Simulation to rate-payer-funded capital intensive road projects.
    Rao, Mahender
    Ranade, Harshavardhan V.
    [J]. ORGANISATIONAL PROJECT MANAGEMENT, 2014, 1 (01): : 74 - 95